2011 Environmental Statement 1.8 MB - Sappi
2011 Environmental Statement 1.8 MB - Sappi
2011 Environmental Statement 1.8 MB - Sappi
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Complaints and reports<br />
The environmental management system also<br />
provides procedures and instructions for dealing<br />
with registration, handling, documentation<br />
and reporting – both internally and externally<br />
– of complaints. Apart form this,<br />
procedures have been defined for legally required<br />
reporting of (temporary) process<br />
changes to the authorities.<br />
In <strong>2011</strong>, <strong>Sappi</strong> Nijmegen BV received one complaint.<br />
Due to miscommunication, no permit was<br />
issued to a ship’s captain for unloading cellulose.<br />
This has been reported by way of complaint to<br />
the Province of Gelderland. The company has<br />
been advised of the incident, after which the permit<br />
was issued as a retroactive correction.<br />
There have been five instances of legally required<br />
or preventive reports to the authorities. All complaints<br />
and reports are followed up by corrective<br />
measures where necessary. Appendix 5 contains<br />
an overview of complaints received and<br />
reports submitted by <strong>Sappi</strong> Nijmegen BV.<br />
Audits<br />
Compliance to all elements of the environmental<br />
management system according to the<br />
ISO 14001:2004 standard is ensured by internal<br />
and external audits, complemented by<br />
management reviews. These audits – both<br />
internal and external – periodically review all<br />
elements, aspects and components of the<br />
environmental management system to assess<br />
whether the principal goal of the system<br />
– control and reduction of impact of business<br />
operations on the environment – is actually<br />
being achieved and whether agreements<br />
made are adhered to in daily practice. Based<br />
on the results of this assessment, Non Conformity<br />
Notes are drafted and adjustments<br />
and/or corrections are made to the management<br />
system and its application.<br />
These documents are available for review by<br />
the authorities, so that they can determine<br />
how the company has followed up on both<br />
internal and external audits and checks.<br />
All measures taken are recorded in a progress<br />
monitoring system, which is part of the<br />
yearly audits and management reviews.<br />
In 2012, <strong>Sappi</strong> Nijmegen BV will also perform<br />
the annual environmental analysis and an<br />
overall assessment as to progress in achieving<br />
the self-imposed objectives. New targets<br />
have been defined for the period <strong>2011</strong><br />
through 2015.<br />
Results of internal audits in <strong>2011</strong><br />
In <strong>2011</strong>, internal audits on working conditions<br />
and environmental performance against the<br />
background of the management system have<br />
taken place in all departments of <strong>Sappi</strong> Nijmegen<br />
BV. These audits were coordinated by<br />
internal auditors, always in other departments<br />
than the ones they are personally attached to,<br />
as a safeguard for impartiality.<br />
Around 17 improvement actions have been<br />
defined in <strong>2011</strong>, relating to quality, working<br />
conditions and – in approximately 33% of all<br />
cases - the environment.<br />
Strong points were the following:<br />
• All (legally required) inspections and tests<br />
have been recorded in SAP, the maintenance<br />
system.<br />
• A carefully designed contingency plan is in<br />
place.<br />
Key areas for improvement related to:<br />
The absence of clear agreements concerning<br />
post-calamity assessment, reporting and correction.<br />
Air-conditioning fills are recorded, but not added<br />
to the logs for the installation concerned.<br />
Results of external audits in <strong>2011</strong><br />
There have been no external audits of the<br />
management system in <strong>2011</strong>. <strong>Sappi</strong> Fine Paper<br />
Europe holds one ISO certification for all<br />
its mills. These are audited in rotation. In December<br />
<strong>2011</strong>, document assessment in preparation<br />
for the ISO 50001 certification audit<br />
took place.<br />
2.1.5 Act<br />
Management review<br />
The aim of management reviews (assessment<br />
by mill management) is to verify whether objectives<br />
and targets have been met and to<br />
judge the efficiency of the (environmental)<br />
<strong>Environmental</strong> <strong>Statement</strong> <strong>2011</strong> 15