2011 Environmental Statement 1.8 MB - Sappi
2011 Environmental Statement 1.8 MB - Sappi
2011 Environmental Statement 1.8 MB - Sappi
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Objectives of the environmental policy:<br />
measures and achievements (targets)<br />
3.1 Introduction<br />
Achieving targets<br />
General targets based on the overall policy<br />
(policy statement) are translated to specific<br />
targets in environmental performance, see<br />
the targets table under Summary, page 4,<br />
and the separate objectives in this chapter.<br />
Targets for realization of environmental objectives<br />
are listed in this chapter according to<br />
subject matter and paragraph as specific<br />
measures in the section ‘Measures implemented<br />
/ measures planned / status’. Considering<br />
the modest size of the organization,<br />
targets (actual measures to be taken) are set<br />
by one department (in most cases Manufacturing)<br />
and managed by one project leader.<br />
The targets are not necessarily defined in<br />
terms of specific figures. The department /<br />
project leader reports on progress in achieving<br />
the targets and on the effects of the<br />
measures implemented, thus facilitating yearly<br />
assessments of the extent to which efforts<br />
on a specific issue contribute to general targets<br />
in the field of environmental performance.<br />
In <strong>2011</strong>, new targets have been defined for<br />
the period through 2015. The base year is<br />
2010, except for energy, where 2009 is the<br />
base year, due to choices made in energy<br />
management according to ISO 50001.<br />
Targets of 0% signify the ambition to maintain<br />
the level of performance from the base year,<br />
because reductions have already been achieved<br />
during the now expired IMT period and/<br />
or because of the fact that emissions are already<br />
below BAT/Bref limits. See paragraph<br />
3.11.<br />
Key indicators<br />
The paragraphs below list targets (key indicators)<br />
and details per type of emission,<br />
The figures (‘R’) in this chapter’s tables represent<br />
the (indexed) ratio of total year consumption<br />
and effect on the relevant area (‘A’),<br />
divided by total year production (‘B’).<br />
A (year consumption/effect on the relevant<br />
area) : B (total year production) = R (result)<br />
Also listed are measures (targets) implemented<br />
so far and those with a certainty of being<br />
carried out in the future to further reduce impact<br />
on the environment, along with the status<br />
concerning actual and expected achievement<br />
of objectives.<br />
Facts and figures<br />
The year totals in consumption and effect (the<br />
company loads) in the relevant area (emissions)<br />
and the total year production figures can<br />
be found in Appendix 2, Facts and figures.<br />
Specific action: annual planning with regard<br />
to working conditions, safety and the environment<br />
The annual planning as recorded in the management<br />
report (for the <strong>Sappi</strong> year, which<br />
runs from October through September) reflects<br />
the operational translation of measures<br />
in the field of working conditions, safety and<br />
the environment (prompted by the results of<br />
internal or external audits, for instance, or based<br />
on suggestions by employees). Progress<br />
on these operational plans is monitored by<br />
mill management on a monthly basis.<br />
Comparison to BAT-Bref / IPPC (Paper &<br />
Pulp) and E-PRTR<br />
The final paragraph of this chapter compares<br />
the levels of actual emission for a number of<br />
the categories in the previous paragraphs to<br />
the theoretical level of emission if Best Available<br />
Techniques (BAT) as defined for the paper<br />
and pulp industry, had been used.<br />
Modifications<br />
Based on the annual environmental analysis<br />
for <strong>2011</strong> and the environmental management<br />
system there is no cause for modifications or<br />
additions to facts and figures or (key) indicators,<br />
nor have there been changes in the organization<br />
that would make such modifications<br />
necessary. See paragraph 2.1.2.<br />
New targets, however, have been set due to<br />
expiration of the BMP-3 period.<br />
<strong>Environmental</strong> <strong>Statement</strong> <strong>2011</strong> 21