get for the project is 4.7 M€. Dutch partners<br />
in the project, apart from <strong>Sappi</strong> Nijmegen BV,<br />
include The University of Twente and the<br />
Knowledge Centre for Paper and Board. In<br />
<strong>2011</strong>, KEMA performed a practical test at<br />
<strong>Sappi</strong> Nijmegen. More information is available<br />
at: www.kcpk.nl<br />
In <strong>2011</strong>, a decision model has been defined<br />
for the combined heat/power plant, which<br />
enables operators to shut down certain parts<br />
of the plant during production stops. This will<br />
allow for savings of approx. 100 MJ/tons of<br />
energy.<br />
In <strong>2011</strong>, the pressure in the compressed air<br />
system has been reduced. Compressing air<br />
requires a lot of energy. Reducing the operational<br />
pressure in the system, saves energy.<br />
In August <strong>2011</strong>, research was done on energy<br />
efficiency. A number of energy saving modifications<br />
will take place as part of the rebuild,<br />
planned for 2012. All other measures<br />
are listed in the opportunity register for energy<br />
savings which is part of the ISO 50001<br />
management system established in <strong>2011</strong>.<br />
Document assessment took place in December<br />
<strong>2011</strong>. The certification audit will take<br />
place in January 2012.<br />
For 2012, a rebuild of the paper machine is<br />
planned. During this rebuild, adjustments will<br />
be made allowing for the exclusive use of<br />
hardwood cellulose as raw material. Other<br />
adjustments will be aimed at increasing (cost)<br />
efficiency. As far as energy is concerned, this<br />
will primarily be accomplished by projects aimed<br />
at energy recovery.<br />
3.2.2 Ammonia (NH3)<br />
Target (related to acidification)<br />
Maintaining the performance level of 2010<br />
(one fourth of the allowed quantity)<br />
Status of measures in this plan period<br />
• Emission of ammonia is a result of small<br />
rest percentages of ammonia in the raw<br />
materials used for coating.<br />
• Emission levels have been calculated since<br />
2004 based on the so-called mass balance:<br />
the proportion of ammonia in the ammonia<br />
containing latices used. This method<br />
is in accordance with the provisions of the<br />
WM license.<br />
• The decrease in <strong>2011</strong>, as compared to<br />
2010, is caused by a choice made in the<br />
latter year, driven by quality considerations,<br />
for a type of latex with a slightly higher ammonia<br />
content. The intention remains to<br />
use only latex types with no ammonia content.<br />
3.2.3 CFC<br />
Target (related to ozone layer depletion)<br />
No more re-filling with newly produced<br />
HCFK’s as of 2010<br />
Status of measures in this plan period<br />
The air-conditioning equipment used by <strong>Sappi</strong><br />
Nijmegen B.V. contains some 230 kilograms<br />
of R22 (HCFK: freons). Maintenance of<br />
this equipment is restricted to a qualified con-<br />