10.07.2015 Views

etude de la qualite des eaux d'un hydrosysteme fluvial ... - LTHE

etude de la qualite des eaux d'un hydrosysteme fluvial ... - LTHE

etude de la qualite des eaux d'un hydrosysteme fluvial ... - LTHE

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Figure 2.4.49: Simu<strong>la</strong>ted and measured water level atN3 in the second periodFigure 2.4.50: Simu<strong>la</strong>ted and measured water levels atN3 in the third periodAs seen from the figure 2.4.49, during the days 19 and 20 when the two dams were close, theestimated water level is higher than the recor<strong>de</strong>d one. Apparently, the actual water flow in thiscondition is lower than the calcu<strong>la</strong>ted one from water level. It means the employed ratingcurve does not adapt well to this special water regime. Besi<strong>de</strong>s, the simi<strong>la</strong>rities of measuredand simu<strong>la</strong>ted water levels in other simu<strong>la</strong>tion times imply the success of mo<strong>de</strong>l in mo<strong>de</strong>llingthe hydrological state of the river system.Figure 2.4.51: Simu<strong>la</strong>ted and measured DO at NT1 inthe second periodFigure 2.4.52: Simu<strong>la</strong>ted and measured DO at NT1 inthe third periodFigure 2.4.53: Simu<strong>la</strong>ted and measured pH at NT1 in Figure 2.4.54: Simu<strong>la</strong>ted and measured pH at NT1 inthe second periodthe third period162

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!