Overall<br />

Activity<br />

Reserve<br />

Osmosis and<br />

Potabilisation<br />

Commissioning<br />

Overall<br />

Systems<br />

Commissioning<br />

Commissioning Environmental Sub-plan (CESP)<br />

Significant Environmental Aspect Potential Hazards and Impacts<br />

Potential injection of dilute sodium<br />

hypochlorite for biofilm control of<br />

SWLP, DMPF, Cartridge filter<br />

systems prior to feed to RO.<br />

Biofilm control of systems prior to<br />

feed to RO.<br />

Commissioning of RO Chemicals<br />

and potabilisation chemical<br />

systems, including sodium<br />

hypochlorite, sodium bisulphite,<br />

antiscalant, carbon dioxide, FSA,<br />

Lime.<br />

Flushing of RO piping from<br />

Cartridge Filter to RO 1st & 2nd<br />

Pass (Disposal of water to Outfall<br />

from RO Building Pipe Flushing).<br />

Commissioning of 1st & 2nd pass<br />

RO system without retention of<br />

permeate.<br />

RO commissioning and<br />

Potabilisation<br />

Process Commissioning, without<br />

retention of permeate.<br />

Reliability Test<br />

Retention of permeate and<br />

discharge of brine.<br />

Commissioning of Stabilisation<br />

Pond.<br />

Commissioning of the VDP -<br />

multiple streams & retention of<br />

permeate.<br />

• Overdosing or poor neutralisation resulting in<br />

off-spec discharge and impact on marine<br />

flora and fauna.<br />

• Overdosing or poor neutralisation resulting in<br />

off-spec discharge and impact on marine<br />

flora and fauna.<br />

• Spills or leaks of chemicals resulting in<br />

contamination of soils and/or<br />

groundwater/surface water and associated<br />

ecosystems<br />

• Spills during truck loading/unloading resulting<br />

in contamination of soils and/or<br />

groundwater/surface water and associated<br />

ecosystems<br />

• Overdosing resulting in off-spec discharge<br />

and impacts to marine flora and fauna<br />

• Construction debris remaining in tunnel<br />

causing discoluration and/or turbidty resulting<br />

in impacts to marine environment.<br />

• Overflowing of pits in RO building resulting in<br />

contamination of surface water runoff.<br />

• Overdosing of caustic soda to 2 nd pass feed<br />

resulting in off-spec discharge and impacts to<br />

marine flora and fauna.<br />

• Potential discharge of potabilisation<br />

chemicals resulting in off-spec discharge and<br />

impacts to marine flora and fauna.<br />

• Failure of inline monitoring system resulting<br />

in off-spec discharge and impacts to marine<br />

flora and fauna.<br />

• Brine discharge causing impact to marine<br />

flora and fauna<br />

• Low flows resulting in poor dilution and<br />

impacts to marine flora and fauna<br />

• Discharge of insufficiently neutralised<br />

chemicals to the outlet resulting impacts to<br />

marine flora and fauna.<br />

• Brine discharge causing impact to marine<br />

flora and fauna<br />

Pipeline Commissioning. • Discharge of chlorinated and/or turbid water<br />

resulting in impact to Cardinia Reservoir<br />

• Leakages resulting in uncontrolled discharge<br />

and impact to surface water ecosystems<br />

// Page 19<br />

// TDV-0-EV-SB-0021.I-03