Victorian Desalination Project - AquaSure
Victorian Desalination Project - AquaSure
Victorian Desalination Project - AquaSure
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Overall<br />
Activity<br />
Reserve<br />
Osmosis and<br />
Potabilisation<br />
Commissioning<br />
Overall<br />
Systems<br />
Commissioning<br />
Commissioning Environmental Sub-plan (CESP)<br />
Significant Environmental Aspect Potential Hazards and Impacts<br />
Potential injection of dilute sodium<br />
hypochlorite for biofilm control of<br />
SWLP, DMPF, Cartridge filter<br />
systems prior to feed to RO.<br />
Biofilm control of systems prior to<br />
feed to RO.<br />
Commissioning of RO Chemicals<br />
and potabilisation chemical<br />
systems, including sodium<br />
hypochlorite, sodium bisulphite,<br />
antiscalant, carbon dioxide, FSA,<br />
Lime.<br />
Flushing of RO piping from<br />
Cartridge Filter to RO 1st & 2nd<br />
Pass (Disposal of water to Outfall<br />
from RO Building Pipe Flushing).<br />
Commissioning of 1st & 2nd pass<br />
RO system without retention of<br />
permeate.<br />
RO commissioning and<br />
Potabilisation<br />
Process Commissioning, without<br />
retention of permeate.<br />
Reliability Test<br />
Retention of permeate and<br />
discharge of brine.<br />
Commissioning of Stabilisation<br />
Pond.<br />
Commissioning of the VDP -<br />
multiple streams & retention of<br />
permeate.<br />
• Overdosing or poor neutralisation resulting in<br />
off-spec discharge and impact on marine<br />
flora and fauna.<br />
• Overdosing or poor neutralisation resulting in<br />
off-spec discharge and impact on marine<br />
flora and fauna.<br />
• Spills or leaks of chemicals resulting in<br />
contamination of soils and/or<br />
groundwater/surface water and associated<br />
ecosystems<br />
• Spills during truck loading/unloading resulting<br />
in contamination of soils and/or<br />
groundwater/surface water and associated<br />
ecosystems<br />
• Overdosing resulting in off-spec discharge<br />
and impacts to marine flora and fauna<br />
• Construction debris remaining in tunnel<br />
causing discoluration and/or turbidty resulting<br />
in impacts to marine environment.<br />
• Overflowing of pits in RO building resulting in<br />
contamination of surface water runoff.<br />
• Overdosing of caustic soda to 2 nd pass feed<br />
resulting in off-spec discharge and impacts to<br />
marine flora and fauna.<br />
• Potential discharge of potabilisation<br />
chemicals resulting in off-spec discharge and<br />
impacts to marine flora and fauna.<br />
• Failure of inline monitoring system resulting<br />
in off-spec discharge and impacts to marine<br />
flora and fauna.<br />
• Brine discharge causing impact to marine<br />
flora and fauna<br />
• Low flows resulting in poor dilution and<br />
impacts to marine flora and fauna<br />
• Discharge of insufficiently neutralised<br />
chemicals to the outlet resulting impacts to<br />
marine flora and fauna.<br />
• Brine discharge causing impact to marine<br />
flora and fauna<br />
Pipeline Commissioning. • Discharge of chlorinated and/or turbid water<br />
resulting in impact to Cardinia Reservoir<br />
• Leakages resulting in uncontrolled discharge<br />
and impact to surface water ecosystems<br />
// Page 19<br />
// TDV-0-EV-SB-0021.I-03