Commissioning Environmental Sub-plan (CESP)<br />
CESP documentation will be controlled in accordance with the Documents and Records Management Plan.<br />
The Commissioning Environmental Representative and Area Environmental Managers, together with the<br />
document controllers, are responsible for ensuring that all controlled documents are:<br />
• Developed, reviewed and approved prior to issue<br />
• Issued for use<br />
• Controlled<br />
• Stored<br />
• Removed from use when superseded or obsolete.<br />
The minimum retention periods for all documents is as nominated in the <strong>AquaSure</strong> EMS Manual.<br />
The Commissioning Environmental Representative is responsible for maintaining CESP documents as<br />
current at the point of use.<br />
6.5 Reference Documents<br />
This CESP has been developed to comply with the Reference Documents. These are set out in Appendix<br />
S2 to the PS&PR. More information on the Reference documents used in the preparation of this Sub-plan<br />
is included in Section 6.2 of the D&C EMP.<br />
6.6 Master Documents<br />
The master of the CESP and associated attachments are stored as an electronic PDF file attached to the<br />
record located within the <strong>Project</strong>s document management system (InCite) along with all related<br />
management plans and associated documentation.<br />
Where required, hard copies are to be derived from the signed electronic master and are deemed<br />
‘uncontrolled’.<br />
‘Masters’ that have been superseded are identified and located within the Controlled Documents File.<br />
Documents are controlled in accordance with the Document and Records Management Plan.<br />