5.2 Commissioning Organisational Structure<br />
The Commissioning Organisation Structure is shown in Figure 6.<br />
Commissioning Director<br />
Plant Commissioning<br />
Manager<br />
Area Lead<br />
Seawater Lift Pump and<br />
Marine Tunnels<br />
Commissioning<br />
Team<br />
<strong>Project</strong> Director<br />
Commissioning<br />
Completion<br />
Manager<br />
Area Lead<br />
Pre-treatment<br />
Commissioning<br />
Team<br />
Commissioning<br />
Environmental<br />
Representative<br />
Area Lead<br />
RO and potabilisation<br />
Commissioning<br />
Team<br />
Commissioning Environmental Sub-plan (CESP)<br />
Stakeholder and<br />
Completions Director<br />
TDJV Environment<br />
Manager<br />
Area Environment<br />
Managers<br />
Environment Team<br />
Figure 6 - Commissioning Orgnisation Structure<br />
Area Lead<br />
Overall Systems<br />
Commissioning<br />
Team<br />
Specialist<br />
Environmental<br />
Consultants and<br />
Subcontractors<br />
// Page 31<br />
// TDV-0-EV-SB-0021.I-03