10.5 Audits<br />

10.5.1 <strong>AquaSure</strong><br />

TDJV will facilitate audits by the <strong>AquaSure</strong> EMR.<br />

Commissioning Environmental Sub-plan (CESP)<br />

The Commissioning Director, Commissioning Manager, Environmental Manager or Area Environmental<br />

Managers will respond to audit reports of the CESP received from the <strong>AquaSure</strong> EMR within the time<br />

specified by the EMR. TDJV will formulate a plan of action to follow-up the findings and recommendations<br />

of the audit, including:<br />

• Describing the planned corrective action/s for each finding<br />

• Nominating a time frame to complete the corrective actions<br />

• Nominating the responsible persons to carry out the corrective actions.:<br />

• Implement remedial/corrective actions within the agreed timeframes<br />

• Notify the EMR of close-out<br />

• Provide evidence of completion where agreed.<br />

The <strong>AquaSure</strong> EMR will review the close out of the audit findings.<br />

10.5.2 TDJV<br />

Internal environmental audits will be conducted in accordance with the MIRA Schedule (Attachment I.3)<br />

and to the standards described in the ‘Environmental Audits’ procedure attached to the EMS Manual.<br />

If the <strong>AquaSure</strong> EMR conducts an audit on an EMS component, that is also scheduled to be audited by<br />

TDJV, the EMR’s audit may suffice as the TDJV audit, with the consent of the EMR. As a guide, the<br />

<strong>AquaSure</strong> EMR and Environmental Manager will (separately or together) undertake the following types of<br />

audits on a regular basis (minimum quarterly):<br />

• D&C EMP - the scope of the audit will assess the level of implementation of the D&C EMP and the<br />

CESP through document review and on-site assessment<br />

• High Risk Activities- the scope of these audits will include an audit focussing on high risk<br />

activities to ensure that environmental controls and procedures outlined in the D&C and AEMPs<br />

are being implemented<br />

Non-conformances will be recorded and managed as set out in Section 9.<br />

10.5.3 External<br />

The IR&EA or the State may audit any part of the <strong>Project</strong> or EMS Manual or other environmental<br />

documentation with reasonable notice for the purposes of confirming compliance with <strong>Project</strong><br />

environmental PRs.<br />

TDJV will facilitate audits by other parties, including the IR&EA and the State as set out in Section 9.5.3 of<br />

the D&C EMP.<br />