• develop an O&M EMP<br />

Commissioning Environmental Sub-plan (CESP)<br />

• obtain approvals and licences to manage waste streams during the O&M Phase<br />

Commissioning Envionmental Monitoring and control Procedure (CEMCP):<br />

• Documents below the level of the EMP Sub Plans, such as Work Packs, Work Area Packs,<br />

Temporary Work Packages and Environmental Procedures, are used to inform Sub Plans and<br />

Environmental controls, and undergo the review process outlined in the D&C EMP.<br />

• For Commissioning works environmental controls are incorporated into the CEMCP.<br />

• The CEMCP is reviewed by the <strong>AquaSure</strong> EMR and Approved by the TDJV Environmental<br />

Manager.<br />

4.6 Operational Management Control<br />

The operational management controls addressed in this section are:<br />

• Commissioning Work Area Packs (CWAPs)<br />

• Commissioning Work Packs (CWPs)<br />

• Work Method Statements and Procedures<br />

• Job Safety Environmental Analysis (JSEA)<br />

• Inspection Test Plans (ITPs)<br />

4.6.1 Commissioning Work Area Packs<br />

Commissioning Work Area Packs (CWAPs) are used to collate the CWPs into individual commissioning<br />

systems. The CWAPs provide a commissioning system area overview for each of the main system phases<br />

of commissioning i.e. Seawater Lift Pump commissioning, DMPF Commissioning, RO Commissioning etc.<br />

The CWAPs:<br />

• Provide an area overview of subsystem for commissioning<br />

• Provide an overall environment impact assessment and risk mitigation<br />

• Provide the risk control measures and / or feed into respective commissioning procedures to<br />

ensure risk is controlled<br />

• Provide overall monitoring of environmental compliance<br />

• Provide overall reporting of monitoring variables<br />

// Page 27<br />

// TDV-0-EV-SB-0021.I-03