CWP<br />
Number<br />
CWP Title<br />
CWP<br />
Number<br />
COMM 016 Treated Water Tanks COMM 044<br />
COMM 017<br />
COMM 018<br />
Sodium Hypochlorite - Pre-<br />
Treatment<br />
Sodium Hypochlorite -<br />
Potabilisation<br />
Commissioning Environmental Sub-plan (CESP)<br />
CWP Title<br />
Transfer Pipeline - One Way Tank<br />
KP29.1<br />
COMM 045 Transfer Pipeline - PRVs at CP1<br />
COMM 046 Transfer Pipeline - Delivery Points<br />
COMM 019 Sulphuric Acid COMM 047 Booster Pump Station<br />
COMM 020<br />
Ferric Sulphate - Sludge<br />
Treatment<br />
COMM 051 Noise Validation<br />
COMM 021 Ferric Sulphate - Pre-Treatment COMM 052 Odour Validation<br />
COMM 022 Coagulant Aid - Pre-Treatment COMM 053 Diffuser Validation<br />
COMM 023 Sodium Bisulphite<br />
4.6.3 Work Method Statements & Procedures<br />
TDV-2-EV-<br />
PRD-0006<br />
Environmental Monitoring Procedure<br />
A work method statement (WMS) is a high level, activity-specific risk assessment and step by step planning<br />
tool contained within each CWP. A WMS details the steps involved in a particular commissioning activity<br />
along with their respective risk control measures. The WMS will identify key environmental risks for<br />
commissioning activities and ensure appropriate controls and mitigation measures – taken from the CESP -<br />
are implemented to ensure that <strong>Project</strong> objectives, targets and obligations are achieved. Procedures are a<br />
more detailed task specific work instruction that is contained within each CWP and used to control specific<br />
activities. Environmental controls are incorporated into specific procedures as part of the CWP<br />
development as outlined by the <strong>Project</strong> Planning and Execution Framework (PPEF).<br />
Commissioning work method statements and procedures (where applicable) will be prepared for all<br />
commissioning activities. They are prepared by the Site Engineer in conjunction with the Site Supervisor,<br />
Foreman and environment team. WMS’s require Comissioning Completion Manager (or delegate) review<br />
for extreme and high-risk (pre-control) Environmental aspects as per the Risk Register prior to works<br />
commencing. It is the responsibility of the Environmental Manager (or delegate) to review proposed<br />
mitigation measures to reduce the extreme and high risks to an acceptable level.<br />
WMSs and procedures will reference relevant controls from the CESP or incorporate additional activity<br />
specific controls.<br />
4.6.4 Job Safety Environmental Analysis<br />
A Job Safety Environmental Analysis (JSEA) is a medium level, activity-specific risk assessment and<br />
planning tool which will be prepared by the Site Supervisor or Site Foreman with input from Engineers and<br />
the environment team. JSEAs will identify the specific environmental management measures – taken from<br />
the CESP, or developed and implemented for the specific commissioning activity being undertaken.<br />
JSEAs require Environmental Manager (or delegate) approval for extreme and high-risk (pre-control)<br />
aspects prior to commissioning works commencing. It is the responsibility of the Environmental Manager<br />
(or delegate) to review proposed mitigation measures in order to reduce extreme and high risks to an<br />
acceptable level.<br />
// Page 29<br />
// TDV-0-EV-SB-0021.I-03