10.07.2015 Views

Parsons - 2010 Construction Management for AWV.pdf - SCATnow

Parsons - 2010 Construction Management for AWV.pdf - SCATnow

Parsons - 2010 Construction Management for AWV.pdf - SCATnow

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

PARSONS600 University Street, Suite 700 • Seattle, WA 98101 • (206) 494-3101 • Fax: (206) 494-0960 • www.parsons.comJanuary 26, 2011Washington State Department of TransportationAlaskan Way Viaduct Program Office999 Third Avenue, Suite 2424Seattle, WA 98104Re:SR 99 Bored Tunnel Alternative Design-Build ProjectDesign-Build <strong>Construction</strong> <strong>Management</strong> ServicesDear Sir or Madam:We are pleased to submit this proposal <strong>for</strong> the <strong>Construction</strong> <strong>Management</strong> services <strong>for</strong> the SR 99 Design-Build project. Inproviding <strong>Construction</strong> <strong>Management</strong> services to WSDOT, we will integrate and work closely with WSDOT, the SR 99project management team, and the design-builder to deliver the SR 99 Design-Build project. The <strong>Parsons</strong> team brings theperfect balance of a professional history of worldwide tunneling construction management (CM) experience andextensive CM experience on transportation design-build tunnel contracts, providing WSDOT the reassurance of a trustedand experienced team that understands its role on this project. <strong>Parsons</strong> will lead our team, which includes Halcrow Inc.,CMTS Inc., The VOSK Group, and a number of recognized technical support experts. Although not required, we arepleased to integrate CMTS, a minority-owned firm, and VOSK, a DBE firm, into our team, and continue our dedication tosupporting these businesses. Collectively, we have per<strong>for</strong>med every role – construction manager, equity partner,program manager, designer, and contractor – and can offer this experience to WSDOT.Leadership with Careers Completely Dedicated to Tunnel <strong>Construction</strong>We believe there is no one better suited to successfully anchor our team than our Resident Engineer, Greg Colzani. He isa recognized expert in soft ground tunneling, who has been practicing CM <strong>for</strong> 30 years. He has filled key roles <strong>for</strong>signature tunnel projects including the Willamette River CSO program in Oregon, the I-70 Hanging Lake Tunnels inColorado, and the South Bay Ocean Outfall in Cali<strong>for</strong>nia. As the <strong>Construction</strong> Manager in Portland, Greg managed anintegrated client and consultant CM team to work collaboratively with the contractor during preconstruction tocomplete the design, evaluate methods, and develop project plans. This process saved millions of dollars through theintroduction of risk-reducing, innovative construction technologies to the country, including slurry TBM technology andsteel-fiber rein<strong>for</strong>ced tunnel segments. Not only a tunneling specialist, Greg has CM experience with highway tunnelcontrol and ventilation systems, installation, integration, and commissioning.We are providing the added value leadership of Steve Minassian, PE, to coordinate all CM service activities. Similar toGreg, Steve has spent his career in tunneling. Over the past 25 years, he has fulfilled many diverse roles serving thetunneling industry. Steve has served as the Design Manager and <strong>Construction</strong> Manager on several high-profile, softground tunneling projects, as well as serving as the Project Manager <strong>for</strong> the Port of Miami Tunnel project, where he wastasked with leading the design-build joint venture’s design ef<strong>for</strong>ts <strong>for</strong> the largest-diameter TBM tunnel in the UnitedStates to date. Steve has participated actively in risk management, partnering, and dispute resolution board proceedings.Professional History Provides Greatest Assurance of SuccessThe <strong>Parsons</strong> team is currently working on or has completed work as the CM on 10 recent,complex tunnel design-build projects. We understand the differences of this role versus a traditional design-bid-buildproject. As a result, we have developed specific CM plans and processes, proven tools, and qualified personnel to managethe cost, schedule, and quality objectives of the design-build projects. Locally, our team has made a commitment to thisregion by delivering transportation solutions since 1929, including key WSDOT projects such as the SR 532 CorridorImprovements Design-Build project; the I-405 Corridor Program; and the Tacoma Narrows Bridge project. We look<strong>for</strong>ward to continuing to partner with WSDOT, and will draw on our experience with WSDOT’s procedures andregulations.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!