Bored Tunnel Alternative Design-Build ProjectDesign-Build <strong>Construction</strong> <strong>Management</strong> ServicesSR 99Table C.1 illustrates how the <strong>Parsons</strong> and Halcrow, complemented with the skills of the other team members, brings toWSDOT an array of skills and experience that meets its required CM managerial and technical needs, while bringing addedvaluein project knowledge, WSDOT knowledge, and relevant local experience.Table C.1 –Team QualificationsKEY TECHNICAL ELEMENTSPARSONSHALCROWCMTSVOSKSoft ground pressurized face TBM tunnels • • • •TBM tunnels constructed below ground water • • • •TBM instrumentation and per<strong>for</strong>mance analysis • • • •Pre-cast gasketed segmental concrete lining systems • • • •Hyperbaric interventions <strong>for</strong> TBM maintenance/repair • • • •Geotechnical instrumentation <strong>for</strong> structure monitoring • • • •Deep ground improvement techniques • • • •Control tunnel construction-induced ground movement • • •Deep excavation, below groundwater • • • •Support of major structures and facilities • • • •Control/mitigation settlement of structures and utilities • • •Systems integration of roadway and tunnel systems • • •Schedule and claims analysis • • •Underground safety program expertise • • •Resident engineering and inspection of tunnel projects • • • •VALUE ADDED SERVICE CAPABILITIESIntegrated team co-located with owner • • • • •Detailed knowledge of SR 99 Design-Build project scope • • • •Risk analysis of SR 99 Design-Build project • • •Understanding of SR 99 Design-Build project costs • •WSDOT Experience • •Commissioning • • •EXPERTSOur organizational chart, shown on the following page, shows our integrated team <strong>for</strong> per<strong>for</strong>mance of all CM services.Our key personnel <strong>for</strong>m the framework of the organization and the additional staff represent further resources who areavailable <strong>for</strong> this program. The organizational chart also indicates the functional authority, lines of communications, andresponsibility of the positions.The <strong>Parsons</strong> team has extensive local and worldwide experience in deep tunnels, soft ground large bored tunnels, andtunnels with extensive systems installation and integration. We will draw on our knowledge of the SR 99 Design-Buildproject as well as this past work. The nine projects presented in this section demonstrate our team’s extensive experiencedesigning and constructing tunnels similar to the SR 99 Design-Build project. This experience and expertise in large boredtunnels will greatly complement our CM services work.8
* Key StaffFirmBored Tunnel Alternative Design-Build ProjectDesign-Build <strong>Construction</strong> <strong>Management</strong> Services SR 99(C) CMTS, Inc.(CRS) CRS EngineeringConsultants, Ltd(H) Halcrow, Inc.(HF) Health<strong>for</strong>ce Partners, LLC(V) The VOSK Group<strong>Parsons</strong> Employee Unless IndicatedExecutive PanelRick Chapman, PEMichael JohnsonRalph Trapani, PEMartin Knights, C. Eng (H)Executive DirectorMichael JohnsonWSDOTCM Services ManagerSteve Minassian*, PESettlementEdward Cording, PhDSegmental LiningChris Smith, C. Eng & FICE (CRS)*Technical AdvisorsHyperbaric InterventionsEdmond Kay, MD, (HF)StructuresGreg Orsolini, PE, Kimo Okamitsu, PE, SEPre-<strong>Construction</strong>CM Support Services Team<strong>Construction</strong>Pre-<strong>Construction</strong>Services LeadJon Kaneshiro, PE*Task Force TeamsDesign Review CoordinatorDon Clark, PETunnelJon Kaneshiro, PE* &Anthony Harding, C. Eng (H)Support of ExcavationJon Kaneshiro, PE* & Tony Stirbys, LEGTunnel Systems/MechanicalDoug Slakey, PE*, Robert Desrosiers,John Bumanis, PE, Paul Bates, C. Eng (H),& Peter Woodburn, C. Eng (H)Settlement MonitoringTony Stirbys, LEG, Jan Babendererde*,& Edward Cording, PhDTBM DesignJon Kaneshiro, PE*, Greg Colzani*,Steve Minassian, PE*,& Jan Babendererde*Interior StructuresBill Elkey, PE, SE,Arun Bhalaik, PE, (H),& Greg Orsolini, PEMOTVic Oblas, PE (V)<strong>Construction</strong> Planning LeadGreg Colzani* & Bob Lenz, PE, CCM*<strong>Construction</strong> Planning TeamCM Plan DevelopmentBob Lenz, PE, CCM*, Eric Ostfeld, PE,& Adam Fredericks, PEMonitoring andInstrumentation PlanningTony Stirbys, LEG, Jan Babendererde*,& Shimi Tzobery, PEHyperbaric SpecialistsRobert Rodgers, Jan Babendererde*,& Edmond Kay, MD (HF)Safety ManagerDaniel Weathers* &Robert Meshew, C. Eng, (H)SchedulerDan Brown* & Ed MastersonTunnel Systems IntegratorDoug Slakey, PE* & Vic Oblas, PE (V)Monitoring/InstrumentationEngineerTony Stirbys, LEG & Jeremy Wehner, PEClaims/Estimating/Change<strong>Management</strong>Ralph Trapani, PE, Gerald Bonner, PE,& Rhonda KolodjiInteragency/Commissioning CoordinatorVic Oblas, PE (V)WSDOT Compliance and ReportingRhonda Kolodji, Bob Lenz, PE, CCM*,& Don Clark, PERisk MitigationBob Lenz, PE, CCM*, Greg Colzani,& John Donatelli, PEQuality Verification PlanBen Fardi, PE* & Eric Ostfeld, PETunnel Chief InspectorMark Bower, C. Eng (H)*Resident Inspection - TunnelsTunnel Chief InspectorMark Bower, C. Eng (H)*Tunnel Excavation/LiningAlf Evers (C)*, Fermin Longcob*,Gary Daniel*, Robert Meshew, C. Eng (H)Grouting/Ground ImprovementBryant Sanders* (C), Lee Moore (C)& Tony Stirbys, LEGTBM Fabrication/Assembly/TestingJan Babendererde*TBM Maintenance/Intervention MonitoringJan Babendererde* & Shimi Tzobery, PESegment FabricationChris Smith*, C. Eng & FICE (CRS)& Mark Bower, C. Eng (H)*Hyperbaric SpecialistsRobert Rodgers, Jan Babendererde*& Edmond Kay, MD (HF)Tunnel Resident EngineerGreg Colzani*Chief InspectorStructuralJeff Lavinder, PE*Resident Inspection - StructuresInterior Structure PrecastFabricationChris Smith, C. Eng & FICE (CRS)*& Mark Bower, C. Eng, (H)*Interior Tunnel StructuresAlf Evers* (C), Nghia Giang*,& Jeff Lavinder, PE*Vent Building Mechanical/FinishesGordon Chen* & Tim DaleyTunnel and Traffic SystemsJoshua Cheatham, PEOff-Site Materials InspectionNghia Giang*9