10.07.2015 Views

Parsons - 2010 Construction Management for AWV.pdf - SCATnow

Parsons - 2010 Construction Management for AWV.pdf - SCATnow

Parsons - 2010 Construction Management for AWV.pdf - SCATnow

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Bored Tunnel Alternative Design-Build ProjectDesign-Build <strong>Construction</strong> <strong>Management</strong> ServicesSR 99Ben Fardi, PE, Quality Verification Plan, <strong>Parsons</strong>OVERVIEWBen Fardi has more than 27 years of civil and structural engineeringexperience involving the design and CM of major toll roads, bridges,arterials, and light rail transit projects; underground subway tunnels;and major suspension steel bridges.Ben was the QA Manager <strong>for</strong> the Tacoma Narrows Bridge Design-BuildProject, with WSDOT in an oversight role. He also participated in thepreparation and review of the RFP documents <strong>for</strong> the I-405 CorridorProgram. Ben was responsible <strong>for</strong> developing and obtaining WSDOT‘sapproval <strong>for</strong> the Quality <strong>Management</strong> Program <strong>for</strong> the SR 532 CorridorImprovements Project. He worked as an assistant Resident Engineer andLead inspector as part of the CM Consultant on the LA Metro Red Line,Segment III.Alf Evers, Interior Tunnel Structures - Inspection, CMTSOVERVIEWAlf Evers has 36 years of progressive construction experience, includingnumerous successful tunnel jobs nationwide and abroad. He is highlyexperienced in transit and highway tunnels, shafts, rail, transit, andhighway construction. Alf is equally experienced in concrete, testing,slurry walls, grouting, excavation support, safety, and record-keepingrequirements. He has supervised tunnel systems, ventilations, andfinish work, and has led QA/QC inspection teams.Fermin Longcob, Tunnel Excavation/Lining - Inspection, <strong>Parsons</strong>OVERVIEWFermin Longcob has over 30 years of experience in undergroundconstruction work per<strong>for</strong>ming combined supervision and QC, sinkingshafts, and driving tunnels using different methods of excavationincluding EPBMs, digger shield tunnel machines <strong>for</strong> soft ground,TBMs <strong>for</strong> hard ground, the conventional methods <strong>for</strong> drilling/blasting,roadheader, the New Austrian Tunneling Method (NATM), sequentialexcavation methods (SEM) technique, stack drift, and micro tunneling.He is equally experienced in soil stabilization and support, shotcreting,rock bolting, soil nails, tie-back, sheet and soldier piles, jet grouting,and cement and chemical grouting. Fermin is experienced in structures,concreting, and interpreting construction plans. He also has a backgroundin civil and structural engineering design.LA Metro Red Line Segment III, Los Angeles, CA: Ben maintaineda QC program <strong>for</strong> this $325 million project that included twomajor cut-and-cover stations, access shafts, a parking structure,underground facilities, cross passages, and twin tunnel line sectionsdriven through the Santa Monica mountains using two 20-footdiameter Robbins TBMs. He also managed the field inspectors’day-to-day assignments. Project Owner: Henry Fuks, Deputy CEPM,(213) 922-7282.I-405 Corridor Program, Kirkland-Bellevue-Renton, WA: Ben isthe Deputy Engineering Service Manager <strong>for</strong> this program, whichinvolves the implementation of a $1.5 billion program <strong>for</strong> improvementsalong a congested 30-mile corridor in the Seattle-Bellevue metropolitanarea. He is responsible <strong>for</strong> developing/negotiating design andconstruction agreements <strong>for</strong> utility relocations. Project Owner: BruceDibert, Engineering Service Manager, (425) 456-8542.Alameda Corridor, Wilmington, CA: Alf was the Chief Inspector <strong>for</strong> theAlameda Corridor in Wilmington, CA, where he supervised 10 inspectors<strong>for</strong> rail installations, two steel truss bridges, three steel girder bridges, aconcrete box girder viaduct, and utility relocations. Project Owner: AlamedaCorridor Transit Authority, (310) 816-0460.Tren Urbano (transit) Tunnels, Puerto Rico: Alf served as the ChiefInspector on the Tren Urbano (transit) Tunnels project in Puerto Rico.He supervised QA/QC oversight <strong>for</strong> two stations and four miles of earthbalance TBM tunnels. Project Owner: Joe Mundo, <strong>Construction</strong> Manager,(787) 690-6688.West Side Willamette River CSO Program, Portland, OR: This projectconsists of 18,000 feet of 14-foot diameter, segment lined tunnel excavatedusing a slurry mixshield TBM. The tunnel alignment ran under and alongsidethe Willamette River in soft soils with a 3.6 bar hydrostatic pressure. Fermin’sduties as the Senior Tunnel inspector were to monitor and document TBMoperations, liner installation, backfill grouting, and hyperbaric interventions.Project Owner: Neal Choate, Inspection Supervisor (503) 823-6496.Big Walnut Augmentation Rickenbacker Interceptor (BWARI) Part 1,Lockbourne, OH: Fermin was the Lead Inspector on this project that consistedof a 14-foot diameter tunnel, 4 miles long, excavated in soft saturated groundusing a Lovat EPB machine with one-pass bolted, precast concrete segmentlining and seven shafts. Fermin’s duties as the Senior Tunnel inspector were tomonitor and document TBM operations, liner installation, backfill grouting,and hyperbaric interventions. Project Owner: Tatyanna Arsh, Executive Director,(614) 645-8276.27

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!