10.07.2015 Views

Parsons - 2010 Construction Management for AWV.pdf - SCATnow

Parsons - 2010 Construction Management for AWV.pdf - SCATnow

Parsons - 2010 Construction Management for AWV.pdf - SCATnow

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Bored Tunnel Alternative Design-Build ProjectDesign-Build <strong>Construction</strong> <strong>Management</strong> Services SR 99Table E.1 Risk CM Role - Design and Pre-construction CM Role - <strong>Construction</strong>TBM Design/Operation:• Loss of control of the face pressuresdue to high pressure gradient betweencrown and invert level• Inability to provide <strong>for</strong> a homogenousmixture of excavated materialsgiven the extremely high probabilityof mixed face or variable soil andgroundwater conditions• Failure of critical TBM components• Immobility of cutterhead• Unexpected inundationWater-Bearing Running SandsLoss of face pressure/poor mixingin the earth plenum triggersuncontrolled flow of running sand/water into the plenumGround Loss at The Face• Surface settlement is caused by loss ofground at the face, above and aheadof the face, and if shunt flow occursbehind the face, especially <strong>for</strong> re-startafter stop and interventionGround Loss Around the Tail Skinand Segmental Lining• Surface settlement occurs by excessiveground loss around the shield orimperfect grouting of the annularbehind the tunnel liningThe CM team must confirm that the design-builder’sdesign provides:• Redundant safety factors <strong>for</strong> the design of TBM componentsdedicated to control the pressure balance• Redundant sensors to monitor face pressures• A supply of bentonite fully available to fill up the chamber inthe event of pressure loss after manned interventions• Numerical/physical model of mixing in the plenum• Additional wear plates, wear detectors, and redundantcutters to minimize interventions• Proper sizing of TBM components to take into account thelarge-scale tunnel• Mechanisms <strong>for</strong> keeping the cutterhead from becomingimmobile in sticky soil• Adequate ports <strong>for</strong> lubrication and conditioning <strong>for</strong> pressurebalance and control of water pressureThe CM team must confirm that the design-builder’sdesign provides:• Designs TBM and procedures to withstand added facepressure• Provides soil conditioning and additional bentonite supply<strong>for</strong> injection, as requiredThe CM team must confirm that the design-builder’sdesign provides:• Selects and designs the TBM to provide soil conditioningincluding bentonite injection, if necessaryThe CM team must confirm that the design-builder’sdesign provides:• Designs grout <strong>for</strong> anticipated ground conditions• Designs a robust grouting system and a redundant back-upsystemThe CM team must monitor the design-builder’sactivities to confirm:• Extensive factory testing of the TBM• TBM is maintained in accordance with manufacturers’recommendations• Face pressure is maintained at all times• Proper conditioning program is tested and used• Monitoring of all machine and operational functions• Plenum filling is completed prior to re-mining• Redundant systems are in place and operational• Backfill grouting system is operating as designedThe CM team must monitor the design-builder’sactivity to confirm:• Fabricates and operates the TBM to increase control of theface in high pressure areas• Uses soil conditioning and additional bentonite injection asrequired.The CM team must confirm that the design-builder:• Refills the chamber with bentonite or other material ascompressed air is lowered• Per<strong>for</strong>ms cutter changes in partially evacuated plenum,refilling and mining ahead and repeating, conducting workin partially filled chamber to reduce the pressure differentialfrom top to bottomThe CM team must confirm that the design-builder:• Controls grout injection with the TBM advance• Provides a robust grouting system and a back-up system• Injects bentonite in the annular space around the TBM shield• Verifies grout by coring and per<strong>for</strong>ms secondary grouting2One-Pass Pre-Cast Bolted Gasketed Segmental Concrete Lining SystemsBenefits to WSDOT• Large diameter segment design, fabrication, and inspectionexperience• In-depth understanding of project-specific geotechnicalconditions as related to lining designOur team members and companieshave designed, fabricated, installed, andinspected over 100 miles of segmentlinedtunnels, including the 10.84-meterDublin Port Tunnel and the 11.34-meterinterior diameter Brisbane Airport Link.35

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!