The reconfiguration proposed is that <strong>of</strong> BF from 550 m 3 to 2015 m 3 , Coke Oven from 0.7 MTPAto 1.0 MTPA, Sinter plant from 60 m 2 to 204 m 2 , addition <strong>of</strong> new VD/AOD and lime plant <strong>of</strong> 600 TPDcapacity. The justification for above is that, scarcity in availability <strong>of</strong> quality raw material for DRIproduction resulting in lower production i.e. 1.8 MTPA in place <strong>of</strong> designed capacity <strong>of</strong> 2.4 MTPA. Tocompensate <strong>the</strong> shortage <strong>of</strong> DRI, additional hot metal (about 1.4 MTPA) is required. Hence, <strong>the</strong> highercapacity <strong>of</strong> BF. Accordingly, o<strong>the</strong>r facilities also need to be reconfigured. There is no additional landrequirement, no additional raw water to be drawn from <strong>the</strong> source and <strong>the</strong> additional power requirementwill be met through <strong>the</strong> existing CPP.The discussion and deliberations on <strong>the</strong> subject matter could not be completed and it wasdecided that <strong>the</strong> matter shall be taken up in <strong>the</strong> next meeting. The committee has also sought a detailedcomparative pollution load <strong>of</strong> various parameters due to <strong>the</strong> proposed reconfiguration.36.2.16 Ferro Alloy Plant with installation <strong>of</strong> 2 x 6.5 MVA Submerged Arc Furnace and manufacture 28,000 TPA <strong>of</strong> Fe-Mn and 19,000 TPA <strong>of</strong> Si-Mn and 9300 TPA <strong>of</strong> Fe-Si or 19,000 TPA <strong>of</strong> Ferro-Chrome at Sy. No: 15/E, Fouzpur Village, Taroda (B) Grampanchayat, Jainath Mandal,Adilabad District <strong>of</strong> Andhra Pradesh by M/s Balaji Electro Smelters Limited – regardingamendment in Environmental ClearanceThe proponent informed that <strong>the</strong>y will not be able to attend <strong>the</strong> meeting. The <strong>Committee</strong> decidedto consider <strong>the</strong> project as and when requested by <strong>the</strong> proponent.36.2.17 Expansion <strong>of</strong> Steel Plant (Unit-IV) by installation <strong>of</strong> Coke Oven Plant (Non-recovery type,1,65,000 TPA) along with Producer Gas Plant (9,000 Nm 3 /hr) and Captive Power Plant(WHRB, 9 MW & CFBC, 36 MW) at Village Banskopa, P.O. Rajbandh, District Burdwan, WestBengal by M/s Jaibalaji Industries Limited- regarding Amendment in EnvironmentalClearanceM/s Jaibalaji Industries Limited had obtained environmental clearance for Coke Oven Plant (Nonrecoverytype, 2,25,000 TPA) from SEIAA, West Bengal vide letter No. EN/82/T-II-I/077/2008, dated 20 thMarch, 2009 and for Coke Oven Plant (Non-recovery type, 1,65,000 TPA) from MoEF vide letter No.F.No. J-11011/496/2009-IA II(I), dated 29 th November, 2010. The PP has requested for amendment in<strong>the</strong> above ECs for <strong>the</strong> following:1. Revision <strong>of</strong> Coke Oven Plant Configuration i.e. installation <strong>of</strong> Coke Oven Plant (Non-recoverytype, 3,50,000 TPA) in place <strong>of</strong> Coke Oven Plant (Non-recovery type, 2,25,000 TPA) and CokeOven Plant (Non-recovery type, 1,65,000 TPA).2. Deletion <strong>of</strong> installation <strong>of</strong> ESP and GCT in EC condition since it is not required in <strong>the</strong> newtechnologyThe PP and <strong>the</strong>ir consultant, M/s. Envirotech East Pvt. Ltd., Kolkata have also made apresentation before <strong>the</strong> committee. It was submitted that, as per <strong>the</strong> technology available from M/s.China Shougang International Trade & Engineering Corporation (CSITEC) / Shanxi Provincial ChemicalDesign Institute (SPCDI), <strong>the</strong> following revision in <strong>the</strong> project configuration is required:Proposal obtained Environmental Clearance Revised ProposalSl.FeaturesNo.Coke oven Plant Coke oven PlantCoke oven Plant(2,25,000 TPA capacity) (1,65,000 TPA capacity) (3,50,000 TPA capacity)1. No. <strong>of</strong> ovens 55 33 802. Type <strong>of</strong> ovens Non-recovery type. Non-recovery type. Non-recovery type.3.WHRBsconnected toovens4 X 12 TPH 3 X 12 TPH 2 X 42 TPH4. StacksWHRBs2 No. each <strong>of</strong> 70 Mtrs.WHRBs1 No. <strong>of</strong> 50 Mtrs.41WHRBs2 No. <strong>of</strong> 70 Mtrs.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!