11.07.2015 Views

prerequisite bidding requirements - R & R Fire Truck Repair, Inc.

prerequisite bidding requirements - R & R Fire Truck Repair, Inc.

prerequisite bidding requirements - R & R Fire Truck Repair, Inc.

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Demo #3709 Smeal <strong>Fire</strong> Apparatus Co. 75’ Heavy Duty AerialThe packing rings shall be of a unique, permanently lubricated, long-life graphite composition andhave sacrificial zinc foil separators to protect the pump shaft from galvanic corrosion.PUMP GEARBOXThe gearbox shall be assembled and tested at the pump manufacturer factory.Pump gearbox shall be of sufficient size to withstand up to 16,000 ft lbs of torque in road operatingconditions. The drive unit shall be designed of ample capacity for lubrication reserve and tomaintain the proper operating temperature.The gearbox drive shafts shall be of heat-treated chrome nickel steel and at least 2-3/4 inches indiameter, on both the input and output drive shafts. They shall withstand the full torque of theengine.All pump drive gears shall be of highest quality electric furnace chrome nickel steel. Bores shall beground to size and teeth integrated, shaved, hardened and ground to give an extremely accurategear for long life, smooth quiet running, and higher load carrying capability. An accurately cut spurdesign shall be provided to eliminate all possible end thrust.The pump ratio shall be selected by the apparatus manufacturer to give maximum performancewith the engine and transmission selected.Oil shall be supplied with the pump gearbox.HALE ANODESThere shall be two (2) Hale zinc anodes provided with the fire pump. The anodes shall aid inpreventing galvanic corrosion within the water pump. The anodes shall be installed in the suctionmanifold of the pump and shall easily replaceable.HALE ANODESThere shall be two (2) Hale zinc anodes provided with the fire pump. The anodes shall aid inpreventing galvanic corrosion within the water pump. The anodes shall be installed in thedischarge manifold of the pump and shall easily replaceable.THERMAL RELIEF VALVE W/INDICATORThere shall be a thermal relief valve, model TRV-L120 installed on the pump. The relief valve shallautomatically relieve water from the pump when the temperature of the pump water exceeds 120degree Fahrenheit. The valve shall automatically reset after activation.A light installed on the pump operator's panel shall indicate when the valve has been activated sothe pump operator may take corrective action. A "push to test" button shall be installed beneaththe indicator lamp to allow the pump operator to test the lamp.AIR OPERATED PUMP SHIFTThe pump shift actuating mechanism shall be air operated from a valve in the cab identified as"PUMP SHIFT". Full instructions for shifting the pump shall be inscribed on the valve plate.Revised 6/2/09 Page 13 of 114

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!