11.07.2015 Views

prerequisite bidding requirements - R & R Fire Truck Repair, Inc.

prerequisite bidding requirements - R & R Fire Truck Repair, Inc.

prerequisite bidding requirements - R & R Fire Truck Repair, Inc.

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Demo #3709 Smeal <strong>Fire</strong> Apparatus Co. 75’ Heavy Duty AerialGENERATOR DISPLAY METERThere shall be an LED generator display meter provided with the generator. The display metershall automatically sense a generator signal and begin displaying information. The digital meterdisplay shall constantly monitor and display voltage, frequency and amps. The display shall becapable of displaying total accumulated run time hours when the MODE button is pressed once.Press the MODE button twice to display the temperature of the oil returning to the oil reservoir.The frog display shall be located on the pump panel.LOAD CENTERThe entire 120/240 volt electrical system shall be installed in strict compliance with NFPA Pamphlet1901, newest edition. This shall include all testing, labeling, wiring methodology, and dimensional<strong>requirements</strong>. Certification of compliance shall accompany the apparatus at the time of delivery.There shall be a 120/240 volt load center incorporated into the 120/240 volt wiring system. Theload center shall include adequate circuit breakers to protect the loads specified on this apparatus.All 120/240 volt A.C. Wiring shall be done in accordance with NFPA Pamphlet 1901 as well asnationally accepted electrical codes.BRANCH CIRCUIT OVERCURRENT PROTECTIONOver current protection devices shall be provided for circuits in accordance with NFPA 1901newest version. The load center shall be equipped with a non-GFI two pole main breaker when thesix or more individual branch circuits are present.Over current protection devices shall be marked with labels to identify the function of the circuitthey protect.The load center shall be located L-1.LOAD CENTER ROLL UP DOOR DRIP TRAY, ROMThere shall be a drip pan with drain provided in the upper section of the compartment. The drippan shall prevent moisture from the roll-up door spool from coming in contact with the breaker box.TELESCOPING 120 VOLT LIGHTSThere shall two (2) Havis-Shields telescoping light pole, part number KR-SB-356, comprised of thefollowing components shall be supplied.Havis-Shields Equipment Corp. Magnafire 5000, model KR-56 light shall be supplied. Therectangular die cast light fixture shall measure 9-1/8" wide by 5-3/8" high by 4-7/8" deep and havea white powder coat finish. The 750 watt 120 volt light shall have a quartz halogen bulb with a fieldreplaceablemodular, 4-7/32" high by 8” wide electro-polished aluminum reflector, and molded,high-heat polymeric handle. The fixture shall have a locking swivel joint with a 3/4" diameter NPTthreaded base to allow the light to be manually tilted up/down and locked in position by theoperator.Product shall be Listed by an accredited NRTL to ensure conformance to UL Standard 1598 andCSA Standard C22.2 No. 250.0 for fixed-mounted luminaires. The Listing shall cover both thefixture and mounting system.Revised 6/2/09 Page 43 of 114

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!