11.07.2015 Views

prerequisite bidding requirements - R & R Fire Truck Repair, Inc.

prerequisite bidding requirements - R & R Fire Truck Repair, Inc.

prerequisite bidding requirements - R & R Fire Truck Repair, Inc.

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Demo #3709 Smeal <strong>Fire</strong> Apparatus Co. 75’ Heavy Duty AerialINSPECTION CERTIFICATE (NFPA 1901 COMPLIANCE)A third party inspection certificate for the aerial device shall be furnished upon delivery of the aerialdevice. The purpose of this NFPA 1901compliance inspection shall be to serve as proof to thecustomer that all applicable standards have been met or exceeded by the responsible aerialmanufacturer.The following objectives shall be achieved as a result (this listing shall not be construed as beingall inclusive):Ensure that understanding of all parties respective responsibilities have been addressed by theactual referencing of NFPA 1901 and the amendments in these specifications and thepurchase contract and documentation.Ensure that only structural materials complying with appropriate standards and codes, areused for construction.Ensure that applicable standards of design and manufacture have been met or exceeded.Ensure that Safety Factors have been met or exceeded where required.Ensure that applicable standards for testing and inspection have been met or exceeded bypersonnel with the appropriate qualifications, experience, and certifications. Ensure that where applicable; components, equipment, and loose equipment carry theappropriate characteristics, classifications, and / or certifications.Ensure that in general and whole, all applicable <strong>requirements</strong> set forth in NFPA 1901, newestrevision; and those codes, standards, and specifications referenced by said; are met,exceeded, and / or addressed.ILLUSTRATED AERIAL OPERATION / MAINTENANCE MANUALSA CD-ROM containing operation and maintenance manuals shall be provided at the time ofdelivery. These manuals shall be written in a "step by step" format for ease of reference.Information included in the manuals shall include, but no be limited to the following:Manufacturer Defined Terminology; (to help impart full understanding of terminology used inthe manuals)Safety Information & Warnings; (to warn of dangerous conditions / personnel injury / equipmentdamage)Complete Rated Capacities Information; (allowable loads & GPM flows) Complete & Detailed Operating Systems Descriptions; (to impart understanding of operation /capabilities / working principles)Instruction For Manufacturer Recommended Deployment & Operation Of All Systems DuringAll Specific Conditions; (to ensure safer - more efficient operation of the aerial device)Current, Actual Illustrations Of Aerial Components Throughout The Manual; (to aid in locationof specific components, being addressed in the manual)Revised 6/2/09 Page 51 of 114

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!