11.07.2015 Views

PNEG-1162CEX - DMC DIII Stir-Ator - David Manufacturing Co.

PNEG-1162CEX - DMC DIII Stir-Ator - David Manufacturing Co.

PNEG-1162CEX - DMC DIII Stir-Ator - David Manufacturing Co.

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

5. InstallationCentre Suspension AssemblyThe triple auger units use a “T” shaped suspension bar, whilst double auger units use a straight bar.7. Assemble the “T” piece. (See Figure 5AQ.) (Straight suspension bar requires no assembly.)Figure 5AQ Assemble “T” Suspension Bar8. Slide the attachment link over the suspension bar and fix it to the upper shaft bracket on the slip ring,using a grade 8, 1/2" x 2" bolt, lock nut and washer. (See Figure 5AR.)Double augersuspension barAttachment linkLifting <strong>Stir</strong>rer into PositionThe stirrer is now ready to hoist into position.Figure 5AR Attach Suspension Bar9. Use a suitable lifting block and tackle or other device, lifting from the centre of the suspension barand track motor end simultaneously.10. Before lifting, move the auger trolley towards the centre of the bin and clamp it in place to stop itrolling backwards and forwards.11. When the suspension bar is about 450 mm above the eave height, the ends of the suspension chainsshould be placed through loops and around the tube ends and hooked back on the main strand withthe “S” hooks. (See Figure 5AS on Page 28.)<strong>PNEG</strong>-<strong>1162CEX</strong> <strong>DMC</strong> <strong>DIII</strong> <strong>Stir</strong>-<strong>Ator</strong> 27

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!