11.07.2015 Views

Installation Manual - Unical Lattner Condensing Hot Water Boilers

Installation Manual - Unical Lattner Condensing Hot Water Boilers

Installation Manual - Unical Lattner Condensing Hot Water Boilers

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Servicing schedule4.6 CLEANING THE CONDENSATE DRAINSIPHONIn order to check and clean the siphon carry out the followingsteps:- disconnect the transparent pipe (A) check that no depositshave accumulated inside the siphon. If there are any depositsflush them out with clean water;- reassemble the siphon in reverse order.Danger!Before commissioning the appliance fill thesiphon via the filling hole and check thecorrect drainage of the condensate.If the appliance is used with the condensatedrain siphon empty this could lead to dangerof intoxication following the escape of fluegasses.Condensatecoming fromthe boilerCondensatedrain.Pipe to beconnectedto the sewageA4.7 SEALING GASKET BETWEENDISTRIBUTOR AND BOILER BODYMixerDANGER!It is absolutely necessary to replace thegasket at any time the inspection or maintenanceis made on the burner.When refitting the mixer tighten the nutsprogressively and in crossed way, by using adynamometric wrench adjusted at 10 Nm (1kgm).Gasketbetweenmixer andboiler body.BurnerBody44

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!