11.07.2015 Views

MCset 3 part1 user_manual - Schneider Electric

MCset 3 part1 user_manual - Schneider Electric

MCset 3 part1 user_manual - Schneider Electric

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

GeneralClosed earthing switch mechanical indicatorlight.Position can be locked using paslocks.Mobile part operationOperation position.“Plugged-in” position.“Withdrawn” position.Insertion / extraction position.RecommendationsHeight (H) of ceiling forinstallation of an anti-arc or IPX1tunnelInstallation above theswitchboardMarkingIt is necessary to have a height of ceiling H u 2.80 m to install a tunnel.All type of equipment installation such as lamp or light are forbidden.It is compulsory forbidden to walk on theparts bearing this marking.It is compulsory forbidden to removethe parts bearing this marking when theequipment is energised.Standard tighteningtorques(non greased screws and bolts)07897302EN indice : C0Screw Torque in NmØ 6 13Ø 8 28Ø 10 50Ø 12 75Ø 14 120Application methods:The elastic washers placed on the externalsides of the pads and busbars ensure betterdistribution of stress regarding screwstightened to the recommended torques.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!