11.07.2015 Views

IDCOL FERRO CHROME & ALLOYS LIMITED - orissatenders.in ...

IDCOL FERRO CHROME & ALLOYS LIMITED - orissatenders.in ...

IDCOL FERRO CHROME & ALLOYS LIMITED - orissatenders.in ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

9such rule <strong>in</strong> existence, the tenderer should clearly mention theprocedure of supply to the other state, such as approval required fromany statutory authority (i.e NOC or otherwise) <strong>in</strong> this regard. Therelevant documents should be enclosed alongwith the General Bid.g) The tenderer must possess valid CST/TIN. A copy of such registrationcertificate is to be enclosed alongwith the General Bid.2) Material to be supplied: Molasses.3) Specification:(a) The material shall be translucent, dark coloured when observed <strong>in</strong> bulk,viscous, syrupy liquid hav<strong>in</strong>g a characteristic odour.(b) The material should not conta<strong>in</strong> any residue/sludge like substance. Itshould have adequate flow-ability.(c) The material shall develop adequate b<strong>in</strong>d<strong>in</strong>g property on mix<strong>in</strong>g withhydrated lime <strong>in</strong> order to be suitable for production of Chrome Orebriquette.(d) The density of molasses supplied shall be 1.35gm per cc m<strong>in</strong>imum.(e) Total reduc<strong>in</strong>g sugar should be 45% to 48%.4) Quantity: 720 MT.5) Period of Supply: 12(twelve) months from the date of LOI/Work Order. Incase, for any reason the buyer is not able to procure the ordered quantitywith<strong>in</strong> the contract period, the buyer has the option to extend the period ofsupply for another one month at the same price, terms & conditions.6) Term<strong>in</strong>ation of the Contract: Purchaser shall have the right to term<strong>in</strong>atethe contract by giv<strong>in</strong>g thirty days notice without assign<strong>in</strong>g any reason thereof.However, <strong>in</strong> the event of any breach of terms of contract, Purchaser shall havethe right to term<strong>in</strong>ate the contract giv<strong>in</strong>g 7(seven) days notice to thesupplier and <strong>in</strong> that case, Security Deposit shall be forfeited.Signature & Seal of Tenderer

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!