11.07.2015 Views

tender

tender

tender

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

13TERMS AND CONDITIONSName of Work: Providing Services for day to day maintenance work for all buildings, roads, internal & externalwater supply & sanitary installations within IHBAS Residential campus under A/R & M/O during 2013-14.Site Conditions: The work shall be carried out at Institute of Human Behaviour and Allied Sciences, G.T. Road, DilshadGarden, Delhi.1.0 GENERAL SPECIFICATION1.1 The work in general shall be carried out in accordance with the CPWD Specifications 2009 Vol. I to II with up-todatecorrection slips.1.2 The order of preference in case of any discrepancy as indicated in condition no. 8.1 under “Conditions ofContract” given in the Standard CPWD Contract form may be read as the following:a) Nomenclature of item as per Schedule of Quantitiesb) Particular specifications and special conditions for civil and electrical.c) General Specificationd) Additional conditionse) Contract Clauses of Standard CPWD Contract formf) CPWD Specifications for civil and electrical as applicable.g) Architectural/structural drawings and specifications mentioned in drawings.h) Indian Standard Specifications of BISi) Manufactures specifications.j) Sound engineering practice as per directions of the Engineer-in-Charge.A reference made to any Indian Standard Specifications in these documents, shall imply reference to the latestversion of that standard, including such revisions/ amendments as issued by the Bureau of Indian Standards uptolast date of receipt of <strong>tender</strong>s. The contractor shall keep at his own cost all such publications of relevant IndianStandards applicable to the work at site.1.3 The <strong>tender</strong>er shall study carefully, the building drawings, specifications, schedule of quantities and conditions ofthe <strong>tender</strong> documents to fully appreciate the scope of work before quoting his rates.1.4 The disposal of building rubbish shall be disposed off at the authorized dumping ground after obtainingpermission from the department concerned.contractor.The charges of the local body if any shall be borne by the1.5 Existing drains, pipes, cables, overhead wires, sewer lines, water lines and other services encountered in thecourse of the execution of the work shall be protected against the damage by the contractor at his own expense.The contractor shall not store materials or otherwise occupy any part of the site in a manner likely to hinder theoperation of such services.1.6 The contractor shall be responsible for the watch and ward of the material provided by him against pilferage andbreakage during the period of Execution and thereafter till the work is physically handed over to the department.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!