141.7 For recording measurements and also for preparing abstract the agreement item number both in words as well asin figures should be given neatly instead of writing description of item in full or abbreviated form, which is not tobe followed in case of extra/substitute items of work those are not covered in the agreement for which fullnomenclature will be produced in the M.B.The full nomenclature of the item shall be adopted in preparing the abstract of cost of final bill and also in bill ofform.1.8 Samples of all building materials, fittings and other articles required for execution of the work shall be gotapproved from the Engineer-in-Charge . Article manufactured by the Firms of repute and approved by theEngineer-in-Charge shall only be used. Articles classified as “First Quality” by the manufacturer shall be usedunless otherwise specified. All materials and articles brought by the contractor to the site for use shall conform tothe samples approved by the Engineer-in-Charge which shall be preserved till the completion of the work.1.9 The contractor shall be required to produce samples of all materials to be arranged and procured by himsufficiently in advance to obtain approval of the Engineer-in-Charge. Subsequently the materials to be used inthe actual execution of the work shall be strictly of the same quality of samples approved. In case of variation inthe quality, such materials shall be liable to rejection. The contractor at his own cost shall immediately removethe rejected material from the site of work. If the contractor fails to remove the rejected material from the sitewithin 48 hours of their rejection, the Engineer-in-Charge is authorized to remove the same at the risk and cost ofthe contractor. No claim financially or otherwise shall be entertained on account of any reason whatsoever.1.10 The water used shall conform to the requirement as laid down in IS: 456-2000.General Conditions1. The maintenance shall be carried out strictly as per direction of engineer-in-charge, and or his authorizedrepresentative.2. The intending contractors are advised to visit the site before quoting the <strong>tender</strong>.3. Contractors are required to quote their rates inclusive of all norms, tools and plants necessary for maintenance ofbuildings, water supply and sanitary installations, sewerage system etc.4. All the T&P shall be arranged by the contractor as required for the execution of work except of heavy machinerylike mixtures, vibrators, road rollers etc. Any loss or damages caused to the T&P items due to negligence byhim/his representative/his staff shall have to be good by the firm/contractor, failing which the department shallmake good the loss/damages at the risk and cost of the contractor.5. The normal working hours of work shall be 9-00 AM to 5-00 PM with half an hour lunch-brake from 1.30PM to2.00pm. With a weekly rest day and rest on national holiday. The eight hours working time can be shifted from9:00 AM to 05:00 PM. If required at the time of execution of work as per direction of engineer-in-charge. Duringemergency time can be extended beyond eight hours.6. The contractor or his authorized representative shall maintain the attendance record of the workers and shallensure that requisite workers are available for attending the complaints. Their records shall be made available byJE/AE/EE for verification.7. Necessary materials required for repair maintenance or replacement of defective material shall be provided bythe department. All the dismantled materials shall be returned to department.8. Log books, complaint books and workers diaries shall be provided and be maintained under the contract showingclearing/disposal of complaints, which have to be got verified from JE/AE(C)-in charge on daily basis as perdirections.9. The payments shall be made to the contractor on monthly basis and by cheque.10. Any damages done/ caused to existing machines/buildings due to negligence by him/his representative/staff shallbe made good by the contractor; otherwise department shall make good the damages at the risk and cost of thecontractor.
1511. The contractor shall be responsible for keeping all the installations in good working conditions. The decision ofengineer-in-charge in this regard shall be final.12. All minor materials like bamboo sticks, mustered oil, log book, complaint book, workers diaries etc. shall bearranged by the contractor, which is in the scope of work without any extra payment.13. All complaints shall be attended immediately. If a complaint is not satisfactorily attended within a reasonabletime, without any reasonable cause, the recovery @ Rs. 100/- shall be made for such case. The decision ofengineer-in-charge shall be final and binding in this respect. The consequential damages due to non attending ofcomplaints shall also be recovered from the contractor as decided by engineer-in-charge.14. Contractors shall provide necessary uniforms to all workers, nothing extra shall be paid on this account. Thededuction will be made @ Rs. 40/- per day per persons for not wearing the uniform. The condition of repairing inuniform shall however, not be applicable during first 15 days of the contract starts. All incidental expendituresincurred on upkeep of the uniform viz washing soap, duster shall be met out by the contractor for which nothingextra shall be payable. If the contractor fails to provide required labour strength for attending complaints withoutany valid reason justified in view of the engineer-in-charge, the penalty may be imposed which shall be recoveredfrom the contractor @ Rs. 660/- per skilled worker i.e. for carpenter/plumber/mason/painter/enquiryclerk/supervisor etc., @ Rs. 540/- per unskilled worker and Rs. 600/- per sewer man for each day of default. Theagency or his authorized representative/engineer shall present himself on the site throughout the currency of theagreement failing which the agency may be liable to be analyzed @ 5% of the work done on the day of hisabsence.15. The contractor shall at all times, carry out work in a manner creating minimum interference in the flow to trafficas per direction of Engineer-in-charge.16. The contractor shall have to make arrangement for getting the complaints attended even after 5.00PM and onweekly holidays.17. If any of staff is not considered suitable then he shall have to be replaced immediately. The decision of engineerin-chargeshall be final in this regard.18. The contractor shall take all appropriate measures to ensure safety of his staff and no compensation shall be paidby the department to the firm in case of any accident etc. in that event, the contractor shall be liable for thecompensation.19. Completed complaint books, workers diaries and log books etc. shall be property of submitted to JE(C)/ AE(C)immediately on its completion.20. The Particulars of the staff to be engaged on work from time to time shall be submitted to JE(C)/ AE(C) in themanner desired for reference and record.21. Any defect/ break down in the system shall immediately be brought to the notice of engineer-in-charge so thatservice does not suffer.22. The staff to be engaged at site should have good work experience. Inexperienced staff in the opinion of theengineer-in-charge shall have to be removed immediately.23. The workers should bear good moral character. The contractor shall be responsible for any misconduct of theworker and such workers shall have to be removed from the site immediately. All the workers shall be issuedphoto Identification card giving the designation of the worker and name of the contractor/agency.24. The contractor shall submit his own bill also for payment every month alongwith attendance record.25. The agency shall be responsible for material issued to his labour for bonafide use on the work. any loss or damageto material shall be responsibility of contractor and shall be made good by the agency failing which the lossevaluated shall be recovered from the contractor. The decision of engineer-in-charge shall be final and binding inthis regard. Similar condition shall be apply in respect of dismantled material.26. The skilled staff i.e. carpenter, plumber, mason should be either I.T.I. qualified or should have good workingexperience in the respective trade. All individual trade man be equipped with necessary T&P for maintenance.Enquiry Clerk should be minimum matriculate.27. The agency shall engage minimum, 1 Supervisor, 3 trade man skilled worker (mason, carpenter, plumber),1 painter, 1 semi skilled worker (sewer man) & 5 unskilled worker as required by engineer-in-charge for managingthe day to day maintenance work.