11.07.2015 Views

Paper - Caris

Paper - Caris

Paper - Caris

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

taken each day.Figure 8: Priority 1 cast locations were acquired with the SBE FastCat 49 CTD on the REMUS AUVJuly 8 and priority 2 cast locations were acquired July 9. All casts were at three dierent times of thetidal cycleThe SBE 49 FastCAT CTD data was run through Velocwin to calculate the sound speed see if theindividual sound speed proles could be detected and split up from the others.3 Results3.1 Algorithm Results and RenementAfter assessing the data acquired from our July 8-9 experiment we found that 13 of the 24 casts takenon July 8 and 20 of the 24 casts taken July 9 were properly determined using a basic algorithm whichwas incorporated into Velocwin (Figure 9).10

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!