v) Total fresh water requirement from GIDC water supply should not exceed 208.42m 3 /day and prior permission should be obtained from the concerned Authority. Noground water should be used.vi) Total effluent generation should not exceed 208 m 3 /day. Effluent should be shouldbe treated in ETP. Treated effluent should be discharged to CETP after conformingto the standards prescribed for norms for the effluent discharge and obtainingpermission from the GPCB regarding. No process effluent shall be discharged inand around the project site. Efforts shall be made to treat ammonical nitrogen in theeffluent.vii) Treated effluent should be passed through guard pond. Online pH meter, flow meterand TOC analyzer should be installed.viii) All the solvent storage tanks should be connected with vent condensers with chilledbrine circulation.ix) The company should obtain Authorization for collection, storage and disposal ofhazardous waste under the Hazardous Waste (Management, Handling and Trans-Boundary Movement) Rules, 2008 and amended as on date for management ofHazardous wastes and prior permission from GPCB should be obtained for disposalof solid / hazardous waste in the TSDF. Measures should be taken for fire-fightingfacilities in case of emergency.x) Green belt should be developed in in 1100 m 2 out of total plant area.xi) All the recommendations made in the risk assessment report should be satisfactorilyimplemented.xii) Occupational health surveillance of the workers should be done on a regular basisand records maintained as per the Factories Act.2.2.12. Proposed Bulk drugs unit at plot no. 632, 633, Village Varsola, Mahemdabad -Nadiad Highway, Taluk Mahemdabad, District Kheda, Gujarat by M/s SwanaPharmaceuticals Pvt. Ltd. (TOR to EC).The Committee noted that EIA/EMP report has been prepared by M/s AksharConsultants, Gujarat, who is a non-accredited consultant as on date and M/s Eco ChemSales & Services came for presentation. Therefore, Committee advised that EIA/EMPreport shall be validated first by the QCI/NABET accredited consultant and submitted tothe Ministry for consideration of environmental clearance.The proposal was deferred till EIA/EMP report validated by the QCI/NABETaccredited consultant is submitted.2.2.13. Membrane Cell based Caustic Soda (400 TPD) and Membrane Cell BasedCaustic Potash Plant (100 TPD) at Sy. No. 1-4, 7-8 &11, VillageBalabhadrapauram, Mandal Bikkavolu, District East Godavari, Andhra Pradesh

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!