11.07.2015 Views

MINUTES OF2ND RECONSTITUTED EXPERT APPRAISAL ...

MINUTES OF2ND RECONSTITUTED EXPERT APPRAISAL ...

MINUTES OF2ND RECONSTITUTED EXPERT APPRAISAL ...

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

13. Location of national parks / wildlife sanctuary / reserve forests within 10 km.radius should specifically be mentioned. A map showing land use / land cover,reserved forests, wildlife sanctuaries, national parks, tiger reserve etc. in 10 kmof the project site.14. Project site layout plan to scale using AutoCAD showing raw materials, fly ashand other storage plans, bore well or water storage, aquifers (within 1 km.)dumping, waste disposal, green areas, water bodies, rivers/drainage passingthrough the project site should be included.15. Details and classification of total land (identified and acquired) should beincluded.16. Proposal should be submitted to the Ministry for environment clearance only afteracquiring total land. Necessary documents indicating acquisition of land shouldbe included.17. Rehabilitation & Resettlement (R & R) should be as per policy of the State Govt.and a detailed action plan should be included.18. Permission and approval for the use of forest land and recommendations of theState Forest Department regarding impact of proposed expansion on thesurrounding reserve forests, if applicable, should be included.19. A list of industries containing name and type in 10 km radius shall beincorporated.20. Residential colony should be located in upwind direction.21. List of raw material required and source along with mode of transportation shouldbe included. All the trucks for raw material and finished product transportationmust be “Environmentally Compliant”.22. Petrological and Chemical analysis and other chemical properties of rawmaterials used (with GPS location of source of raw material) i.e. ores, minerals,rock, soil, coal, iron, dolomite quartz etc. using high definition and precisioninstruments mentioning their detection range and methodology such DigitalAnalyzers, AAS with Graphite furnace, ICPMS, MICRO-WDXRF, EPMA, XRD,Nano studies or at least as per I30-10500 and WHO norms. These analysisshould include trace element and metal studies like Cr (vi) Ni, Fe, As, Pb, Zn, Hg,Se, S etc. Presence of radioactive elements (U, Th etc.).23. Petrography, grain size analysis and Major element analysis of raw material andsoil from project site and raw material should be done on the same parametersalong with analysis for SiO 2 , Al 2 O 3 , MgO, MnO, K 2 O, CaO, FeO, Fe 2 O 3 , P 2 O 5 ,H 2 O, CO 2.24. If the rocks, ores, raw material has trace elements their petrography, oremicroscopy, XRD, elemental mapping EPMA, XRF is required to quantify theamount present in it and hence future risk involved while using it andmanagement plan.25. Studies for fly ash, muck disposal, slurry, sludge material and solid wastegenerated should also be included, if the raw materials used has trace elementsand a management plan.26. Manufacturing process details for all the cement plant, captive power plant andmine should be included.27. Possibility of installation of WHRB will be explored and details included28. Mass balance for the raw material and products should be included.29. Energy balance data for all the components including proposed power plantshould be incorporated.30. Site-specific micro-meteorological data using temperature, relative humidity,hourly wind speed and direction and rainfall should be collected.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!