11.07.2015 Views

MINUTES OF2ND RECONSTITUTED EXPERT APPRAISAL ...

MINUTES OF2ND RECONSTITUTED EXPERT APPRAISAL ...

MINUTES OF2ND RECONSTITUTED EXPERT APPRAISAL ...

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

xx.Restoration of the project site should be carried out satisfactorily and report shouldbe sent to the Ministry’s Regional Office at Bhopal.xxi. Oil content in the drill cuttings should be monitored by some Authorized agencyand report should be sent to the Ministry’s Regional Office at Bhopal.xxii. Under Corporate Social Responsibility (CSR), sufficient budgetary provision shouldbe made for health improvement, education, water and electricity supply etc. in andaround the project.xxiii. Company should have own Environment Management Cell having qualifiedpersons with proper background.xxiv. Company should prepare and circulate the environmental policy.xxv. Company should prepare operating manual in respect of all activities. It shouldcover all safety & environment related issues and system. Measures to be takenfor protection. One set of environmental manual should be made available at thedrilling site/ project site. Awareness should be created at each level of themanagement. All the schedules and results of environmental monitoring should beavailable at the project site office.2.2.16. Integrated Steel Plant (2.0 MTPA) alongwith Caol based Power Plant (2 x250MW) at Village Hijalgarh, Mouja, PS Jamuria, District Burdwan, West Bengal byM/s Rashmi Cement Ltd. - regarding ECThe Committee noted that the proposal is incomplete for want of coal linkage, ironore linkage etc. and deferred the proposal.2.2.17. Expansion of Integrated Cement Plant (Clinker 3.6 to 7.2 MTPA; Cement 5.0 to10.0 MTPA) by installation of Line -II at Village Bharauli and Itahara, TehsilMaihar, District Satna in Madhya Pradesh by M/s Reliance Cementation Pvt.Limited- regarding TORsThe project authorities and their consultant, M/s Vimta Labs, Hyderabad gave adetailed presentation on the salient features of the project and proposed environmentalprotection measures to be undertaken along with the draft Terms of Reference forpreparation of EIA/EMP report. All the Cement Plants (> 1.0 MTPA) are listed at S.No.3(b) under Category ‘A’ of the schedule of EIA Notification, 2006 and appraised by theExpert Appraisal Committee (Industry) of MoEF.M/s Reliance Cement Company Private Limited have proposed for expansion ofIntegrated Cement Plant (Clinker 3.6 to 7.2 MTPA; Cement from 5.0 to 10.0 MTPA) byinstallation of Line-II at Village Bharauli and Itahara, Tehsil Maihar, District Satna inMadhya Pradesh. Total project area is 166 ha. And expansion would be done within theexisting plant premises. Greenbelt will be developed in an area of 55 Ha (i.e. 33 %).There is no National Park/Wildlife Sanctuary/Biosphere Reserve within 10 km radius ofthe project site and River Tamas flows at a distance of 0.6 km. The total project cost of

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!