5. Recent monitoring report from SPCB, which shall include data on AAQ, waterquality, solid waste etc. shall be submitted.6. Has the unit received any notice under the Section 5 of Environment(Protection) Act, 1986 or relevant Sections of Air and Water Acts? If so,compliance to the notice(s)7. A line diagram/flow sheet for the process and EMP8. The earlier questionnaire for industry sector should be submitted whilesubmitting EIA/EMP.9. A site location map on Indian map of 1:10, 00,000 scale followed by1:50,000/1:25,000 scale on an A3/A2 sheet with at least next 10 Kms ofterrains i.e. circle of 10 kms and further 10 kms on A3/A2 sheets with properlongitude/latitude/heights with min. 100/200 m. contours should be included.3-D view i.e. DEM (Digital Elevation Model) for the area in 10 km radius fromthe proposal site.10. Present land use should be prepared based on satellite imagery. Highresolutionsatellite image data having 1m-5m spatial resolution like quickbird,Ikonos, IRS P-6 pan sharpened etc. for the 10Km radius area from proposedsite. The same should be used for land used/land-cover mapping of the area.11. Break up of small, medium and large farmers from whom the land is beingacquired. If small farmers are involved, a detailed R&R plan.12. Location of national parks / wildlife sanctuary / reserve forests within 10 km.radius should specifically be mentioned. A map showing land use / landcover, reserved forests, wildlife sanctuaries, national parks, tiger reserve etc.in 10 km of the project site.13. Project site layout plan to scale using AutoCAD showing raw materials, flyash and other storage plans, bore well or water storage, aquifers (within 1km.) dumping, waste disposal, green areas, water bodies, rivers/drainagepassing through the project site should be included.14. Details and classification of total land (identified and acquired) should beincluded.15. Proposal should be submitted to the Ministry for environment clearance onlyafter acquiring total land. Necessary documents indicating acquisition of landshould be included.16. Rehabilitation & Resettlement (R & R) should be as per policy of the StateGovt. and a detailed action plan should be included.17. Permission and approval for the use of forest land and recommendations ofthe State Forest Department regarding impact of proposed expansion on thesurrounding reserve forests, if applicable, should be included.18. A list of industries containing name and type in 10 km radius shall beincorporated.19. Residential colony should be located in upwind direction.20. List of raw material required and source along with mode of transportationshould be included. All the trucks for raw material and finished producttransportation must be “Environmentally Compliant”.21. Petrological and Chemical analysis and other chemical properties of rawmaterials used (with GPS location of source of raw material) i.e. ores,minerals, rock, soil, coal, iron, dolomite quartz etc. using high definition andprecision instruments mentioning their detection range and methodology suchDigital Analyzers, AAS with Graphite furnace, ICPMS, MICRO-WDXRF,EPMA, XRD, Nano studies or at least as per I30-10500 and WHO norms.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!