2.2.22. Expansion of Integrated Cement Project-clinker, Cement, CTPP, D.G. Set &WHRB at Villages Sangaria, Borakherid, Peearkhera and Rasulpura, TehsilNimbahera, District: Chittorgarh, Rajastha by M/s Wonder Cement Ltd. -regarding TORsThe project authorities and their consultant, M/s. J.M. EnviroNet Pvt. Ltd.,Gurgaon gave a detailed presentation on the salient features of the project andproposed environmental protection measures to be undertaken along with the draftTerms of Reference for preparation of EIA/EMP. All the Cement Plants (> 1.0 MTPA) arelisted at S.No. 3(b) under Category ‘A’ of the schedule of EIA Notification, 2006 andappraised by the Expert Appraisal Committee (Industry) of MoEF.M/s. Wonder Cement Ltd. has proposed for expansion of Integrated CementPlant – Clinker (from 2.0 to 6.0 MTPA), Cement (from 3.25 to 8.0 MTPA), CPP (from 40to 80 MW), D.G. Set (from 2.0 to 7.0 MW) & WHRB (2X9 MW) at Villages: Sangaria,Borakherid, Peearkhera and Rasulpura, Tehsil: Nimbahera, District: Chittorgarh,Rajasthan.Total Plant area including colony and approach road is 191.064 ha. andtheproposed expansion will be carried within the existing plant premises. Out of the totalplant and colony area of 191.064 Ha, 71.31 ha (i.e. 37 %) has been proposed to bedeveloped under green belt / plantation. 22.33 ha area has already been covered undergreen belt / plantation.No National Park, Wildlife Sanctuary, Biosphere Reserve fallswithin 10 km radius of the project site. Three Protected Forests and one ReservedForest fall within 10 km radius of the project site. Murliya Dam, Nimbahera River,Kadmali River, Gambhiri Reservoir, Uncha Talav and Gambhiri River are within 10 kmradius of the project site. Total cost of the project is Rs. 2,625 Crores. Capital cost forEnvironmental Protection Measures is Rs. 210 Crores and Recurring Cost is Rs. 2.1Crores/annum. The existing and proposed project configuration is given below:UnitsExistingCapacity(Line I)Proposed ExpansionCapacityEnhancement in Newcapacity Line II(Line I-ExistingLine)TotalCapacityafterExpansionClinker (MTPA) 2.0 1.0 3.0 6.0Cement (MTPA) 3.25 0.75 4.0 8.0Captive ThermalPower Plant (MW)40.0 -- 40.0 80.0WHRB (MW) -- 1X9 1X9 18.0D.G. Set (MW) 2.0 -- 5.0 7.0The cement plant will be based on the dry process technology for cementmanufacturing with pre-heating and pre-calciner technology. Limestone, Red Ochre,Laterite, Gypsum, Fly ash and Coal are the raw materials that will be used. Limestonewill be sourced from the captive limestone mine located in adjoining villages Bhatkotri,Phalwa, Lasrawan, Rasulpur. Gypsum and fly ash will be sourced Nagpur/Bikaner(Rajasthan) and own CPP/Kota TPP/nearby TPP respectively. Existing Powerrequirement is 37.09 MW and additional power required for the proposed expansion

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!