12.07.2015 Views

Installation Manual - Unical Lattner Condensing Hot Water Boilers

Installation Manual - Unical Lattner Condensing Hot Water Boilers

Installation Manual - Unical Lattner Condensing Hot Water Boilers

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Instructions for the installer3.15 - FLUE INSTALLATIONThe flue system must be installed in accordance with thelocal and national Standards (refer to UNI 13384-1-2)The flue outlet must be made only with material resistantto products of combustion, pertaining to class W1according to UNI EN 1443, and as a rule made in stainlesssteel or plastic material.We recommend using only original UNICAL flueoutlet systems.Damages caused by installation errors and fornon-observance of the instructions given bythe same manufacturer will invalidate all thesupplier’s contractual or extra contractualresponsibilities.FLUE OUTLETS Ø 100 mm Type B23The maximum total horizontal run permittedby the Ø 100mm outlet and intake pipe is 30 minclusive of 1 wide radius bend and 1 flue outletterminal.L min = 1 m - L max = 30 m0026251400361494The boiler has been approved for the following flueconfigurations:00361495Type B23Boiler designed to be connected to an open flue which willterminate vertically through the roof. The combustion air isintaken directly from the room where the boiler is installed.WARNING: for this type of connection the room must complywith the same installation regulations valid for open chimneyboilers.The chimney must comply to the current regulations.Preliminaryoperations:Min. 300 mm0036149300361495- Fit the flue outlet pipeØ 100mm, suppliedin the packaging, asindicated in thefigure.24

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!