12.07.2015 Views

Installation Manual - Unical Lattner Condensing Hot Water Boilers

Installation Manual - Unical Lattner Condensing Hot Water Boilers

Installation Manual - Unical Lattner Condensing Hot Water Boilers

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Instructions for the installer3.22 - INITIAL LIGHTINGPRELIMIARY CHECKSThe first ignition must be carried out by aqualified technician. Failure to do so couldcause injury to persons, animals or damageto property. UNICAL shall not be held liablefor any injury and/or damage.Before lighting the boiler check that:- the boiler installation has been carried out in accordancewith the specific Standards and regulations in force forthe gas part and for the electrical part;- the air supply and the discharge of the products ofcombustion are carried out in the correct way inaccordance to the specific Standards and regulations inforce;- the gas supply system is correctly dimensioned for theboiler’s output and is fitted with all the safety and controldevices prescribed by the regulations in force;- the electrical supply must be 230 V - 50 Hz;- the system has been filled with water (pressureregistered on the gauge 0,8/1 bar with pump not running);- any on-off valves of the system are open;- the mains supply gas corresponds to the one which theboiler has been calibrated for: otherwise convert the boilerto use the available gas (refer to section: “GASCONVERSION”); this operation must be carried out by aqualified technician in compliance to the regulations inforce;- the gas supply cock is open;- there are no gas leaks;- the external mains supply switch is on;- the system’s safety valve on the boiler is not blocked andthat it is connected to the sewage system;- the condensate drain siphon has been filled with water;DANGER!Before firing the appliance fill up the siphonthrough the filling hole and check the correctdrainage of the condensate.If the appliance is used with the condensatedrain siphon empty this could lead to dangerof- there are no water leaks;- all the necessary ventilation conditions and minimumclearance distances are guaranteed for subsequentservicing.LIGHTING AND SHUTTING DOWN PROCEDURESFor lighting and shutting down the boiler refer to the“INSTRUCTIONS GUIDE FOR THE PERSON IN CHARGE OFTHE APPLIANCE”Information to be passed on to the person incharge of the applianceThe person in charge of the appliance must be instructedon the use and operation of the boiler and in particular detail:- Hand the booklet: “INSTRUCTIONS GUIDE FOR THEPERSON IN CHARGE OF THE APPLIANCE”, as well asall the other literature relative to the appliance, andplaced in the envelope contained in the packaging, tothe person in charge of the appliance. The person incharge of the appliance must retain this literature forany future reference.- Inform the person in charge of the appliance of theimportance of the air vents and of the flue outlet system,stressing the fact that absolutely no modification can bemade.- Inform the person in charge of the appliance regardingthe control of the system water pressure and how torestore it to the correct value.- Explain and demonstrate to the person in charge of theappliance the correct function and adjustment of thetemperature, thermostats and radiators for theeconomic use of the system.- Remind the person in charge of the appliance that acomprehensive service and the measurement of thecombustion efficiency should be carried out regularly(as requested by the national law).- If the appliance is sold or transferred to another owneror if the present user moves home and leaves theappliance installed, ensure yourself that the manualalways follows the appliance so that it can be consultedby the new owner and/or installer.42

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!