12.07.2015 Views

E-Andrew Sindt Creative Component S11.pdf

E-Andrew Sindt Creative Component S11.pdf

E-Andrew Sindt Creative Component S11.pdf

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Absolute value of percent deviationfrom observedAbsolute value of percent deviationfrom observed252015105TSS0-40% -30% -20% -10% 0%Percent adjustment of max. Vesilind settling velocityFigure 4.16 - Effluent TSS calibration for BNR-S1 mode by adjustment of maximum Vesilind settlingvelocity (0% represents default maximum Vesilind settling velocity value in simulator)The substrate (NH 4 + ) half-saturation concentration was adjusted to correct the effluent NH 3concentration. A side effect of adjusting the substrate (NH 4 + ) half-saturation concentration is asignificant decrease in the effluent NO 3 concentration (Figure 4.17). This decrease in effluent NO 3 - -Nresults in an increase in percent error for NO 3 - -N. A choice needed to be made between minimizing theerror in NH 3 -N while increasing the error of another NO 3 - -N versus minimizing the error in bothparameters, but the error in NH 3 -N to a lesser extent than the first option. The latter was chosenbecause it placed the error in both NH 3 -N and NO 3 - -N below 20%.504540353025201510500% 20% 40% 60% 80% 100%Percent adjustment of substrate (NH 4+ ) half-saturationconcentrationNH3NO3Figure 4.17 - Effluent NH 3 -N concentration calibration for BNR-S1 mode by adjustment of AOB substratehalf-saturation concentration (0% represents default substrate (NH 4 + -N) half-saturation value insimulator)59

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!