12.07.2015 Views

T O W N R E P O R T 2007 L U N E N B U R G - Town of Lunenburg

T O W N R E P O R T 2007 L U N E N B U R G - Town of Lunenburg

T O W N R E P O R T 2007 L U N E N B U R G - Town of Lunenburg

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

DEPARTMENT OF PUBLIC WORKSJohn M. Rodriquenz, DPW Director“ The mission <strong>of</strong> the Department <strong>of</strong> Public Works is to protect, preserve and improve the <strong>Town</strong>’s infrastructure andrelated assets in a manner which meets and enhances the current and future social and economic needs <strong>of</strong> thecommunity, to contribute to a healthy, safe and quality environment for the <strong>Town</strong>’s citizens and visitors, and to providea cost effective and environmentally sound means <strong>of</strong> disposing <strong>of</strong> solid waste and wastewater”Public Works combines the resources <strong>of</strong> the Highway, Park, Cemetery, Sewer, and Facilities divisions, and VehicleMaintenance services into one department organizing personnel and equipment to best serve the residents <strong>of</strong> ourcommunity. The DPW has taken the lead in a successful effort to meet state mandates, EPA and DEP requirements forstorm water management, fuel storage and effective disposal <strong>of</strong> hazardous waste. To date the community is in totalcompliance. Moving forward the department will address those problem areas as identified through a town-wideinspection. Furthermore, the program <strong>of</strong> public education and awareness will be expanded via work shops,publications, and links available through the <strong>Town</strong> <strong>of</strong> <strong>Lunenburg</strong> web site.The following is a breakdown <strong>of</strong> line item allocations and expenditures for Fiscal <strong>2007</strong>:Payroll / OvertimeThe amount <strong>of</strong> $369,574.00 was originally budgeted for highway division and clerical payroll with an additional $3000.00added to cover overtime expenses (exclusive <strong>of</strong> winter operations). Actual overtime costs totaled $4983.00. Apercentage <strong>of</strong> the salaries <strong>of</strong> three DPW staff members was covered by the sewer enterprise fund due to their dailyinvolvement. A shift in personnel left positions unfilled for a time allowing for a portion <strong>of</strong> payroll to be unexpended.Total expended from DPW payroll; $329,893.00General Highway MaintenanceThe cost <strong>of</strong> drainage supplies, patching and paving materials, shoulder repair, roadside trimming, street sweeping, anddrain cleaning are funded through this line. The purchase <strong>of</strong> tools, small equipment items, and the outsourcing <strong>of</strong> tasksbeyond the resources <strong>of</strong> the department are also funded from this account. Total allocation =$73,000.00, totalexpenditure = $54,074.00. A spending freeze instituted by the CAFO during the winter months resulted in a balance thatwas utilized to <strong>of</strong>fset other town deficits.Traffic SignsUtility charges to operate and maintain electronic signalization at the intersection <strong>of</strong> RT 13 and Whalom RD, andflashing caution signals in school zones are funded through this item. Standardized street signs, posts and installinghardware are purchased with these funds, Traffic markings; cross walks, stop bars etc. are also funded through thisline item.Original appropriation = $7,500.00, overall expenditure = $7,765.00Facilities MaintenanceThe department <strong>of</strong> Public works is responsible for the care and maintenance <strong>of</strong> all <strong>Town</strong> buildings and grounds(excluding those <strong>of</strong> the school department).The original appropriation was $119,244.00.Due mainly to series <strong>of</strong>unanticipated expenses for repairs to the old vacant structures as well as the newly constructed buildings the overallexpenditure for FY <strong>2007</strong> was $137,983. The absence <strong>of</strong> an exit plan and maintenance schedule has, at least in partresulted in the overage in Facilities.<strong>Town</strong> Highway Garage / Public Works FacilityThe highway division / vehicle maintenance facility located at 520 Chase Rd serves as the central location for the publicworks department. Costs to operate the physical plant: utilities, waste removal, janitorial supplies, postage and <strong>of</strong>ficeequipment totaled $19,254.00. An intra-budget transfer was made to supplement the original allocation <strong>of</strong> $13,513.00.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!