( 10 )3<strong>2.</strong> A loaded truck shall not be allowed to go out of the mine unless the driver signsin the required documents of the mine at appropriate places. In case a driverrefuses to sign, he shall be directed to unload the iron ore in the stack <strong>and</strong> thenbe allowed to go out of mine. <strong>The</strong> management shall not be responsible for anyloss or damage suffered by the drivers or truck owners or the purchaser onaccount of aforesaid decision of the management.33. <strong>The</strong> truck drivers shall be supplied with a computer printed sheet dulyauthenticated containing the record of weighment of their empty <strong>and</strong> loadedtrucks every time they come in <strong>and</strong> go out of the mine with the loaded truck.34. <strong>The</strong> driver shall also be issued a challan in proper <strong>format</strong> containing the evidenceof loading <strong>and</strong> transportation out of the iron ore in question. <strong>The</strong> challans,prepared in required number of copies, must mention, among other, itsdestination <strong>and</strong> route to be taken <strong>and</strong> must be authenticated at each stage ofoperations. <strong>The</strong> contents of challan shall not contradict those in the TransitPermit <strong>and</strong> Transit Pass referred above. Challans shall also be signed by theconcerned drivers. All the entries in the challan shall be clear, transparent <strong>and</strong> beauthenticated. <strong>The</strong>re shall be no confusion or ambiguity about the purpose ofwriting various entries in the challan <strong>and</strong> in underst<strong>and</strong>ing them.35. <strong>The</strong> truck drivers shall obey the instructions of the Mines Manager or hisauthorized representative with regard to falling of trucks in line for weighment<strong>and</strong> their movements inside the mine.36. <strong>The</strong> trucks shall not remain inside the mine a minute more than considerednecessary. After loading the iron ore, they shall immediately fall in line for grossweighment at the weigh bridge <strong>and</strong> go out after the weighment. <strong>The</strong>y must takethe route mentioned in their challan.37. When the entire quantity of iron ore allotted to the Party has been removed <strong>and</strong>transported out, the Mines Manager will intimate the Commercial Division ofMines in writing (ink-signed) the actual quantity of iron ore despatched after theweighment of trucks at the weigh bridge, to facilitate Mines Commercial Divisionto make the bills, accordingly.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!