12.07.2015 Views

Final Report, 2010 Urban Water Management Plan - Culver City

Final Report, 2010 Urban Water Management Plan - Culver City

Final Report, 2010 Urban Water Management Plan - Culver City

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Agency: Golden State <strong>Water</strong> Company District Name: Metro CUWCC Unit #: 5041Retail4CUWCC BMP RETAIL COVERAGE REPORT 2009-<strong>2010</strong>Foundation Best <strong>Management</strong> Practices for <strong>Urban</strong> <strong>Water</strong> Efficiency1.3 METERING WITH COMMODITY RATES FOR ALL NEW CONNECTIONS AND RETROFIT OF EXISTINGCONNECTIONSExemption or 'At least as Effective As'accepted by CUWCCNumbered Unmetered Accounts2009 <strong>2010</strong>If signed MOU prior to 31 Dec 1997, On Track if all connectionsmetered; If signed after 31 Dec 1997, complete meter installationsby 1 July 2012 or within 6 yrs of signing and 20% biannualreduction of unmetered connections.2008 0 On Track 0 On Track On Track if no unmetered accountsMetered Accounts billed by volume ofuseNumber of CII accounts withMixed Use metersConducted a feasibility study to assess meritsof a program to provide incentives to switchmixed-use accounts to dedicated landscapemeters?Yes On Track Yes On Track2,028 2,050 Info onlyVolumetric billing required for all connections on sameschedule as meteringNo On Track until 2012 No On Track until 2012 On Track if Yes, Not on Track if NoFeasibility Study provided to CUWCC? No On Track until 2012 No On Track until 2012 On Track if Yes, Not on Track if NoCompleted a written plan, policy or programto test, repair and replace metersYes On Track Yes On Track On Track if Yes, Not on Track if No

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!