12.07.2015 Views

SUBCOURSE EDITION - Modern Prepper

SUBCOURSE EDITION - Modern Prepper

SUBCOURSE EDITION - Modern Prepper

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Step 4: The intersections formed by the .519 centimeter arcs and grid lines are now connected with alight construction line (fig 4-6). This line determines the easting coordinate of the projection corner andtells us that the projection corner is located somewhere on this line. To determine the exact position,we must now plot the northing measurement 1.590 centimeters as shown on DA Form 1941.72Figure 4-6. Connecting points (.519 centimeters).

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!