12.07.2015 Views

DCI Specs - Digital Cinema Initiatives

DCI Specs - Digital Cinema Initiatives

DCI Specs - Digital Cinema Initiatives

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

The flow chart in Figure 16: System Start-Up Overview, is an example of how a systemstart-up may occur. This flow chart is informative. There are other designs that may havedifferent steps or different sequences that will accomplish the same result and meet therequirements of this specification.Figure 16: System Start-Up Overview9.4.3.2. Pre-show PreparationsPre-show preparations include tasks to be performed (well) in advance of show time toensure adequate lead-time to resolve any issues that might impact the compositionshowing. These preparations do not prepare an auditorium for a showing, but aredesigned to provide assurance that all prerequisites for a specific showing have beensatisfied.• Composition Playlist (CPL) check(s) – Composition Playlists (CPL) shallbe validated by the Security Manager participating in the respectivecomposition playback.• Composition decryption preparations – Each encrypted composition willhave associated with it a Key Delivery Message (KDM), carrying time windowconstraints, decryption keys, and a Trusted Device List (TDL). The SMS,<strong>DCI</strong> <strong>Digital</strong> <strong>Cinema</strong> System Specification v.1.2 Page 105

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!