13.07.2015 Views

STEEL AUTHORITY OF INDIA LIMITED - Metaljunction

STEEL AUTHORITY OF INDIA LIMITED - Metaljunction

STEEL AUTHORITY OF INDIA LIMITED - Metaljunction

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Minimum validity of DD/BC/PO shall be approximately six months from therespective date of submission. EMD by cheque will not be accepted.However, Small Scale Units/ Ancillary Units and Public Sector Units/ GovernmentUndertakings and Co-operative Societies may be exempted from submission ofEMD. The exemption for submission of EMD shall also be granted to those partieswho have registration with SSI / NSIC granting exemption for executing such workin totality as specified in <strong>OF</strong>A document. (Documents in this regard to be submittedto <strong>Metaljunction</strong> as per Clause no.4 of Annexure-A and clause –14 of Annexure –I).In case the bidder refuses to accept the LOA / LOI or doesn’t make the payment asmentioned above within the stipulated time, the EMD will be liable for forfeiture andhis acceptance of the <strong>OF</strong>A shall be considered as withdrawn16.SECURITY DEPOSIT: The SB shall have to furnish non-interest bearing SecurityDeposit representing 5% of the full value of the materials at the bided price and thedeposit shall be retained by SAIL-ISP till completion of the order, on the basis of theprices bided / accepted within 7 days from the date of receipt of LOA / LOI by PayOrder / Demand Draft / Banker’s Cheque drawn in favour of ‘SAIL-IISCO SteelPlant’ on a scheduled bank (Co-operative Banks are not acceptable) and payable atBURNPUR / ASANSOL. Minimum validity of DD/BC/PO shall be ofapproximately six months from the date of submission, for which the payment ismade. The lot wise EMD amounts shall be adjusted against the respective securitydeposit/s.. If the due Security Deposit amount is more than the EMD deposited, thebalance amount has to be submitted within 7 days from the date of receipt of LOA /LOI by Pay Order / Demand Draft / Banker’s Cheque Co-operative Banks are notacceptable) drawn in favor of “SAIL-IISCO Steel Plant” on a scheduled bank(CooperativeBanks are not acceptable) and payable at BURNPUR/ASANSOL. Nointerest shall accrue on the Security Deposit or the EMD submitted. The SecurityDeposit money shall be refunded on satisfactory completion of the contract, afterrecovery of dues if any on either side and on SBs confirmation of “No Demand” withrespect to materials and amounts from SAIL-ISP against the relevant contract.In case the bidder doesn’t make the payment as mentioned above within thestipulated time, the EMD will be liable for forfeiture and his acceptance of the <strong>OF</strong>Ashall be considered as withdrawn.SAIL-ISP Management will be entitled to recover from the Security Deposit allmoney due to SAIL-ISP concerning the sale and other statutory liabilities of the<strong>OF</strong>A. Delivery Order shall be issued to the SB only after submission of the SecurityDeposit and the full value of material(s) with due taxes, duties, other levis etc. as perterms of payment.17. SALES TAX(a) Sales Tax with surcharge and any other duties, taxes, levies etc. are payable extraas applicable over and above the Sale Value at the quoted price as ruling on the timeof delivery. Bills will be raised by Burnpur finance Department of SAIL-ISP, WestBengal. Depending on his location / address the SB who has to move the goods11

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!