5. Price Break-Up Schedule (Appendix – A)-a) The prices shall remain firm during the tenure of the contract. In case thebidder is unable to bid a firm price, SAIL-ISP reserves the right to rejectthe offer.b) Quantities and volume of work in respect of various items of workselaborated in this specification are tentative. Variation in the quantitiesmay occur during actual execution.c) Certification of quantum of work carried out by the SB will be done onthe basis of joint records of the SB and the Executing Agency or hisauthorised representative.d) The copy of the Price Break-Up Schedule (Appendix – A) shall be dulyfilled in with comprehensive sum total of highest price(s) bided by the H-1 Bidder(s) and faxed within 24 hrs after completion of online forwardauction to metaljunction and the said original document must reach DGM( Mktg.), SAIL-ISP, within 3 ( Three ) working days from thecompletion of the online Forward auction under intimation to<strong>Metaljunction</strong>. Failure to comply the same may make the bid liable forcancellation and EMD submitted by SB may be forfeited.6. SPECIAL INSTRUCTIONS TO BIDDER6.1 The Bidder should inspect the site and take due note of the working conditions, practicesand arrangements in vogue in the plant and satisfy himself as to the nature and quantumof work before submitting the bid.6.2 Since more agencies may be working at site simultaneously, the SB shall have to work inclose co-operation with them ensuring smooth and safe working. The exact timing ofdismantling of different items shall be decided in consultation with the EA or hisauthorised representative keeping in view the overall co-ordination aspects ofdismantling and working requirements thereof.6.3 The SB shall do all necessary site work and construction of the site office / stores as maybe required by him only after taking permission from the EA or his authorisedrepresentative at the specified location shown by them.6.4 All temporary lighting work required for executing this work shall be done by the SB andall materials, such as light fittings, hand lamps, distribution boards etc. shall be arrangedby him. All such work shall comply with safety standards and electricity rules.6.5 The EA or his authorised representative reserves the right to interrupt or alter thesequence of work, whenever such interruption or alteration is necessitated due to any5

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!