13.07.2015 Views

Mount Majura Solar Farm - the National Capital Authority

Mount Majura Solar Farm - the National Capital Authority

Mount Majura Solar Farm - the National Capital Authority

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

A proposal requires <strong>the</strong> approval of <strong>the</strong> Environment Minister if an action is likely to have a significantimpact on a matter of national environmental significance or listed as a matter of national significance whichincludes:i) World Heritage Propertiesii)iii)iv)Wetlands of International Importance (Ramsar wetlands)Commonwealth Listed Threatened Species and Ecological CommunitiesCommonwealth Listed Migratory Speciesv) Nuclear actionvi)vii)Commonwealth marine areasCommonwealth landThis Act aims to ensure <strong>the</strong> conservation and recovery of flora and fauna species and communities at astate and national level. The requirements of EPBC Act under Part 13 - Species and communities, are that<strong>the</strong> Minister must establish a list of threatened species, threatened communities and key threateningprocesses.To determine whe<strong>the</strong>r or not a referral for EPBC is required is determined by undertaking an EPBC analysisto ascertain if <strong>the</strong> proposed solar farm is likely to have a significant impact on a matter of nationalenvironmental significance or <strong>the</strong> environment on Commonwealth land.From <strong>the</strong> above list only parts iii) and iv) are even potentially applicable for <strong>the</strong> Proposed Works. Informedby expert advice from NGH Environmental, and supported by <strong>the</strong>ir Environmental Assessment (Annexure5), <strong>the</strong> Proponent does not consider that <strong>the</strong> Proposed Works pose <strong>the</strong> potential to have a ‘significant impacton matters of national environmental significance’ and <strong>the</strong>refore <strong>the</strong> Proposed Works do not need to bereferred for assessment under <strong>the</strong> EPBC Act.The initial draft self-assessment according to <strong>the</strong> flowchart below indicates that <strong>the</strong> Proposed Works do nothave a significant impact, hence a submission to <strong>the</strong> EPBC will be made supporting this conclusion. It isnoted that <strong>the</strong> 20MW Royalla <strong>Solar</strong> <strong>Farm</strong> to be located on <strong>the</strong> Monaro Hwy South of <strong>the</strong> city centre, and <strong>the</strong>15MW AGL <strong>Solar</strong> <strong>Farm</strong> to be located in Williamsdale have both completed <strong>the</strong> EPBC self-assessmentprocess and been confirmed as not being a controlled action (determination made on 10th August 2012 and4th June 2012 respectively).14<strong>Mount</strong> <strong>Majura</strong> <strong>Solar</strong> <strong>Farm</strong> – Works Approval Submission

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!