13.07.2015 Views

Mount Majura Solar Farm - the National Capital Authority

Mount Majura Solar Farm - the National Capital Authority

Mount Majura Solar Farm - the National Capital Authority

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

The two direct neighbours to <strong>the</strong> project will also be consulted with directly to confirm that <strong>the</strong>se measureswill be sufficient as visual amenity impact mitigation measures, or to o<strong>the</strong>rwise determine fur<strong>the</strong>r measuresand implemented <strong>the</strong>se where reasonable and feasible.See also later discussion with respect to landscaping implementation as a mitigant to visual amenityimpacts.CONSTRUCTION REQUIREMENTSThe construction timeline for <strong>the</strong> project would be dependent on <strong>the</strong> timing of approval and fundingarrangements and <strong>the</strong> supply of key components. Construction of <strong>the</strong> solar array and associated equipmentis expected to take approximately 3 months. Construction is anticipated as being conducted in one ormultiple stages, with separate sections of infrastructure considered as discrete work packages andcommenced at different times.However, assuming approval in <strong>the</strong> first half of 2013, would be with construction of an up to 2MW stage 1occurring during <strong>the</strong> second half of 2013, and with fur<strong>the</strong>r stages up to <strong>the</strong> total 4MW capacity occurring infuture years. Based on this timing, an indicative staging for <strong>the</strong> project is presented below:Mid 2013Sept 2013Dec 2013negotiation of agreements and ordering components (4-6 months)construction commences (~3 months)solar farm operational30-50 years See decommissioning section for end of project lifeDue to <strong>the</strong> modularity of solar array technology, little heavy machinery or heavy works are required.Therefore <strong>the</strong> construction period is expected to be discreet.The construction of <strong>the</strong> Proposed Works would include activities such as:Establishment of temporary lay-down areas for equipment and shipping containersDelivery of up to approximately 20 shipping containers of equipment (distributed throughout <strong>the</strong>construction period)Civil works for access track construction and trenching for cablesPile driving equipment to install pylons to support <strong>the</strong> solar array mounting structureMechanical installation of <strong>the</strong> mounting structure and solar modules (analogous to assembly of a‘meccano set’)Trenching of underground cabling34<strong>Mount</strong> <strong>Majura</strong> <strong>Solar</strong> <strong>Farm</strong> – Works Approval Submission

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!