13.07.2015 Views

Mount Majura Solar Farm - the National Capital Authority

Mount Majura Solar Farm - the National Capital Authority

Mount Majura Solar Farm - the National Capital Authority

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Figure 4.9 Soil profilesAll above ground infrastructure would be removed at <strong>the</strong> decommissioning stage, and <strong>the</strong> affected areaswould be rehabilitated and revegetated.Construction and decommissioning impacts are expected to be temporary and localised. With best practice,<strong>the</strong>se works are not likely to represent unacceptable risks to soil values at <strong>the</strong> subject site.4.8Hydrology and Water QualityExcavation, soil stockpiling and haulage represent potential risks to water quality from sedimentation during<strong>the</strong> construction and decommissioning periods. The transport of chemicals and <strong>the</strong> use of hydrocarbonsrepresent chemical spill risks.51<strong>Mount</strong> <strong>Majura</strong> <strong>Solar</strong> <strong>Farm</strong> – Works Approval Submission

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!