13.07.2015 Views

Mount Majura Solar Farm - the National Capital Authority

Mount Majura Solar Farm - the National Capital Authority

Mount Majura Solar Farm - the National Capital Authority

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

ush fire risk mitigation and weed control would be undertaken as required using sheep grazing, slashing orspraying.After <strong>the</strong> expected 25 to 30 year lifetime of <strong>the</strong> PV panels, <strong>the</strong> solar panels and o<strong>the</strong>r components of <strong>the</strong>solar farm may be refurbished or replaced to improve <strong>the</strong> performance of <strong>the</strong> facility.DECOMMISSIONINGThe proposal includes a commitment to decommissioning at <strong>the</strong> end of <strong>the</strong> project life. Lifetime of <strong>the</strong> projectis expected to be up to 50 years. Potential uses of <strong>the</strong> site at <strong>the</strong> end of project life include refurbishing <strong>the</strong>solar PV facility and continuing operation, re-developing <strong>the</strong> site, or decommissioning of <strong>the</strong> projectinfrastructure and site rehabilitation. This would be <strong>the</strong> responsibility of <strong>the</strong> Proponent.In <strong>the</strong> case of decommissioning, all above ground infrastructure would be removed from <strong>the</strong> site andrecycled or o<strong>the</strong>rwise disposed of at approved facilities. All areas of soil disturbed during decommissioning,including tracks, would be rehabilitated using appropriate pasture species. Access tracks that <strong>the</strong> landowner wishes to retain may be left in place.36<strong>Mount</strong> <strong>Majura</strong> <strong>Solar</strong> <strong>Farm</strong> – Works Approval Submission

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!