13.07.2015 Views

Mount Majura Solar Farm - the National Capital Authority

Mount Majura Solar Farm - the National Capital Authority

Mount Majura Solar Farm - the National Capital Authority

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

VEHICULAR ACCESS, INTERNAL ROAD AND CAR PARKINGError! Reference source notfound.Figure 3.5 shows <strong>the</strong> indicative location in yellow of <strong>the</strong> proposed internal access roads, with anaccess point from <strong>Majura</strong> Road at <strong>the</strong> north eastern corner of RB708. Access gates to each block will beconstructed at this point. On site parking for up to three cars for site maintenance and visitation will beprovided, as shown in Figure 3.3 – Detail C. The Proposed Works would be accessed from <strong>Majura</strong> Road inbetween Approved Registered Blocks 707 and 708 at <strong>the</strong> eastern side of <strong>the</strong> site. <strong>Majura</strong> Rd provides anappropriate access point for <strong>the</strong> proposal, with good sight lines and <strong>the</strong> ability to develop sealed or unsealedshoulder/turning bay at <strong>the</strong> entrance. Given that this land has been <strong>the</strong> subject of a withdrawal from <strong>the</strong>Crown Lease by <strong>the</strong> ACT Government for <strong>the</strong> <strong>Majura</strong> Parkway, <strong>the</strong> Proponent will need to consult with ACT27<strong>Mount</strong> <strong>Majura</strong> <strong>Solar</strong> <strong>Farm</strong> – Works Approval Submission

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!