13.07.2015 Views

Mount Majura Solar Farm - the National Capital Authority

Mount Majura Solar Farm - the National Capital Authority

Mount Majura Solar Farm - the National Capital Authority

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>the</strong> local open grassland/woodland landscape is Colourbond Woodland Grey or, if not available, ColourbondWindspray will be selected.GRID CONNECTIONThe Proposed Works include establishment of a new grid connection point with ActewAGL Distribution’s11,000V distribution network in <strong>the</strong> vicinity of <strong>the</strong> project. Network augmentation to facilitate and establishthis connection may be conducted by ei<strong>the</strong>r <strong>the</strong> Proponent and/or ActewAGL Distribution. This infrastructuremay include:New pad mounted transformer(s)New or augmented underground or overhead 11,000V cablesNew or augmented switchgear and protectionCommunications equipmentProvision of access to grid connection infrastructureThe Proponent is in ongoing dialogue with ActewAGL to determine <strong>the</strong> preferred grid connection point for<strong>the</strong> project. Three indicative alternative connection points have been identified in Figure 3.8 below. Thesou<strong>the</strong>rn two grid connection points would require new overhead or underground cabling to cross <strong>Majura</strong>Rd. The nor<strong>the</strong>rn most grid connection point utilises a network connection on <strong>the</strong> west side of <strong>Majura</strong> Rd,obviating this need, however would likely require augmentation to <strong>the</strong> existing 11,000V line crossing <strong>Majura</strong>Rd.Note that <strong>the</strong> Development Envelope also includes a small corridor of land in <strong>the</strong> road corridor between RB707 and 708. This is to allow for site access and underground electrical reticulation that may be requiredbetween <strong>the</strong> Proposed Works in RB 707 and 708. The Proponent will be required to liaise fur<strong>the</strong>r withACTPLA with respect to appropriate use and land tenure for this area prior to construction.31<strong>Mount</strong> <strong>Majura</strong> <strong>Solar</strong> <strong>Farm</strong> – Works Approval Submission

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!