Final Scoping Report for the Proposed ... - SRK Consulting
Final Scoping Report for the Proposed ... - SRK Consulting
Final Scoping Report for the Proposed ... - SRK Consulting
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
<strong>SRK</strong> <strong>Consulting</strong>: 408836 Tubatse FSR Page xix<br />
List of Abbreviations<br />
BID(s) Background In<strong>for</strong>mation Document(s)<br />
CO Carbon Monoxide<br />
CO2<br />
Carbon Dioxide<br />
CDM Clean Development Mechanism<br />
Cr 6+ Hexavalent chrome<br />
EAP Environmental Assessment Practitioner<br />
EIA(s) Environmental Impact Assessment(s)<br />
EMP Environmental Management Plan<br />
FeCr<br />
FSR<br />
H2<br />
Ferrochrome<br />
<strong>Final</strong> <strong>Scoping</strong> <strong>Report</strong><br />
Hydrogen<br />
IAPs Interested and Affected Parties<br />
Mamsl Meters Above Mean Sea Level<br />
NEMA National Environmental Management Act No 107 of 1998<br />
NO Nitrogen Monoxide<br />
NO2<br />
Nitrogen Dioxide<br />
ORC Organic Rankine Cycle<br />
PM10 Particulate Matter with an Aerodynamic Diameter of Less than 10 μm<br />
RoD Record of Decision<br />
Samancor Chrome Samancor Chrome Limited<br />
SO2<br />
Sulphur Dioxide<br />
<strong>SRK</strong> <strong>SRK</strong> <strong>Consulting</strong> (Pty) Ltd<br />
ToR Terms of Reference<br />
TSP Total Suspended Particulate<br />
Anam/ Mol 408836_Tubatse FSR October 2011