02.12.2012 Views

Final Scoping Report for the Proposed ... - SRK Consulting

Final Scoping Report for the Proposed ... - SRK Consulting

Final Scoping Report for the Proposed ... - SRK Consulting

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Project Nature of work Client Date<br />

Kusasa Commodities<br />

Maguga dam<br />

SCI Natural Gas Project<br />

THP EIA<br />

Winnaarshoek Road<br />

Annesley<br />

Oilkol<br />

Butanol Project<br />

EA System<br />

Falémé Iron Ore Project -<br />

Senegal<br />

Gabon scoping (Gabon)<br />

Liqhobong Diamond Mine<br />

(Lesotho)<br />

Cradle of Humankind World<br />

Heritage Site<br />

Rand Water<br />

Sasol Butanol Plant<br />

Avondale-Stanger Bulk<br />

Water Scheme<br />

Nagle Dam Spillway<br />

betterment project<br />

EIA <strong>for</strong> <strong>the</strong> construction of a bulk<br />

storage facility in Richards Bay <strong>for</strong><br />

<strong>the</strong> storage of materials produced at<br />

<strong>the</strong> Iscor CPC in Empangeni<br />

EIA <strong>for</strong> <strong>the</strong> attenuation dam,<br />

Swaziland<br />

EIA <strong>for</strong> <strong>the</strong> conversion of coal to<br />

natural gas<br />

Environmental impact assessment <strong>for</strong><br />

<strong>the</strong> proposed roads, water supply<br />

pipeline and associated infrastructure<br />

<strong>for</strong> <strong>the</strong> Twickenham-Hackney-<br />

Paschaskraal (THP) Mine in <strong>the</strong><br />

Nor<strong>the</strong>rn Province.<br />

EIA <strong>for</strong> <strong>the</strong> construction of a road to<br />

provide access to <strong>the</strong> Trojan Platinum<br />

Mine in <strong>the</strong> Sekhukhuneland<br />

Magisterial District of <strong>the</strong> Nor<strong>the</strong>rn<br />

Province.<br />

Review of Annesley Environmental<br />

Management Plan and EMPR<br />

amendment<br />

EIA <strong>for</strong> <strong>the</strong> expansion of <strong>the</strong> facility in<br />

Durban<br />

EIA <strong>for</strong> a proposed butanol plant in<br />

Sasolburg<br />

Environmental Assessment System<br />

Manual<br />

<strong>Scoping</strong> study project report and<br />

programme to take to a bankable<br />

feasibility study<br />

EIA <strong>for</strong> <strong>the</strong> Marina golf course<br />

project, which involves <strong>the</strong><br />

establishment of a marina,<br />

commercial small boat harbour, upmarket<br />

residential area, 18 hole golf<br />

course, hotel and office component<br />

Environmental impact assessment<br />

and EMPR<br />

Integrated Environmental and<br />

Conservation Management Plan <strong>for</strong> a<br />

proposed World Heritage Site in<br />

Gauteng<br />

<strong>Scoping</strong> study <strong>for</strong> R3 pipeline in<br />

Centurion<br />

EIA <strong>for</strong> a proposed butanol plant in<br />

Sasolburg<br />

EIA and EMP <strong>for</strong> a bulk water supply<br />

pipeline and reservoir<br />

EIA <strong>for</strong> augmentation of spillway<br />

capacity of a dam in a nature reserve<br />

Kusasa Commodities 2001<br />

Maguga Dam Joint<br />

Venture<br />

Sasol Chemical<br />

Industries<br />

Anglo Platinum 2001<br />

Trojan Platinum (Pty)<br />

Ltd<br />

SAMREC 2001<br />

Sasol Chemical<br />

Industries<br />

2001-Ongoing<br />

2001-ongoing<br />

2001-ongoing<br />

2001<br />

2000<br />

GJMC / DANCED 2000<br />

Lithos Corporation 2000<br />

Entech/Endev 2000<br />

Batemans 2000<br />

Gauteng Department<br />

of Agriculture,<br />

Conservation and <strong>the</strong><br />

Environment<br />

1999<br />

Rand Water 1999<br />

Sasol Chemical<br />

Industries<br />

1999 – ongoing<br />

Umgeni Water 1999-2000<br />

Umgeni Water 1999 -2000

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!