13.07.2015 Views

DESIGN NOTE

DESIGN NOTE

DESIGN NOTE

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Insitu reinforced concrete deckPrecast panels+3.8 mCD+0.0 mCDPrecast beamsReinforced concrete abutmentBackfill Sand1:1.5Quarry RunInterim dredge depth -6.5mCD1:3Design dredge depth -11.5mCDExisting materialØ800mm steel tubular piles-24.0mCDTitle:SALDANHA GMQ Ext. FEL3 STUDYFigure No.Deck-on-Piles 6

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!