13.07.2015 Views

DESIGN NOTE

DESIGN NOTE

DESIGN NOTE

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Precast cope panel – extended to -0.5m CD andgrout filled behind to protect against corrosionReinforced concrete capping beam+3.8mCDM100(500 MPa) 35m long0.0 mCDStone DrainBackfill SandFilter LayerAZ18 (350 MPa) Anchor Wall- Length of 7m - oversized due toincreased liquefaction risk in uppersoil strataQuarry RunInterim dredge depth -6.5mCDExisting materialDesign dredge depth -11.5mCDAZ46 (430 MPa)Main WallPotential Calcrete layers(50MPa)-24.0mCDMethod:1. Drive AZ46s2. Install AZ18 anchor wall3. Place to interim level - quarry run, filter layer and backfill material4. Install M76 tie rods5. Backfill anchor6. Tension tie rods7. Complete Back fill8. Install cope, services, paving and furnitureTitle:SALDANHA GMQ Ext. FEL3 STUDYFigure No.Steel Sheet Pile – Infill Section 2

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!